NASA Johnson Space Center
Oral History Project
Commercial Crew & Cargo Program Office
Edited Oral History Transcript
William
H. Gerstenmaier
Interviewed by Rebecca Wright
Washington, DC – 12 June 2013
Wright: Today is June 12, 2013. This oral history interview is being
conducted with Bill Gerstenmaier at NASA Headquarters in Washington,
DC, for the Commercial Crew & Cargo Program Office History Project.
Interviewer is Rebecca Wright. Mr. Gerstenmaier is the Associate Administrator
for the Human Exploration and Operations Directorate at NASA Headquarters,
and has been in that position since August of 2005. Thanks again.
We know you’re always busy, so thanks for taking time to talk
to us.
Prior to being in this position, you had served as the Program Manager
for the International Space Station [ISS]. Can you share with us what
some of the thoughts were when you were still in that position—before
COTS [Commercial Orbital Transportation Services] was introduced as
a concept—of the ideas that you were going to use to help supply
the Station?
Gerstenmaier:
It was an interesting time. We were given the decree that Space Shuttle
was going to be retired at some point fairly soon. Space Shuttle was
a critical element of being able to supply Space Station, as well
as to actually assemble Space Station. We were really scrambling on
how we were going to replace the capability of the Shuttle with a
new system and a new vehicle. We had to figure out the right phasing
and work through all of the political activities associated with that.
When a new [NASA] Administration came in under Mike [Michael D.] Griffin—from
Sean O’Keefe we had gotten a previous decree. Under Administrator
O’Keefe, the Vision for Space Exploration was established and
the Vision framework involved retirement of the Space Shuttle Program
and a goal of lunar exploration. Under Administrator Griffin, the
details of Vision were developed. This included the exact number of
remaining Shuttle flights and details of an exploration strategy—Ares
I, Ares V [rockets], Altair lunar lander—and Orion [Crew Exploration
Vehicle] that began with the Moon.
We were going to do the Constellation Program, and we were going to
retire the Shuttle Program and move forward. Mike wanted to expedite
that activity to actually move a little bit faster than what had been
done under O’Keefe. He was looking to try to ramp down the Shuttle
Program even faster than the previous Administrator had done. We were
under a lot of pressure to try to figure out creative ways of keeping
Space Station supplied and functional, and able to do research.
We also had to convince our International Partners. Their modules
had not flown yet to Space Station, they had made significant investments
in Space Station, and their stuff was still sitting on the ground.
This was post-Columbia [STS-107 accident] and we hadn’t really
established a repeatable flight rate after Columbia with Shuttle.
Then we’re already talking about Shuttle potentially retiring.
We had a lot of work to do with the partners to convince them that
we had a viable plan for Space Station and that their modules were
really going to get launched. We were going to actually complete assembly,
and then once we got assembly done we would have the ability to resupply
cargo and research and keep Space Station resupplied.
It also really changed the way we did business. Station was designed
with hardware that was intended to be returned to the ground, repaired
on the ground, and then flown back up on Shuttle. We had to go to
a totally different philosophy with all our hardware onboard Space
Station. We had to now look at hardware as being expendable, where
it could not be returned, because we lost a lot of return capability
when the Shuttle went away. So that hardware had to essentially be
disposed of on orbit, and then replaced in a steady stream from the
ground. It changed our entire management and operations philosophy
with Station.
When you hear about the program and you think about what we were facing
at that time, we were in a tremendous transition period and tremendous
uncertainty about exactly how we were going to realize the vision
of completing Station assembly and then also moving into research.
It looks all fine and well ordered from today, looking backwards,
but at that time there was a tremendous amount of angst in the system
about how we were going to pull all of this off. I’ll tell you
frankly, even today we’re not fully transitioned. We’re
in the process of that, and we can talk about it more later. We’re
not there yet fully, but at least we’re down the path. It looks
like we’re on a strategy that’s sustainable and allows
us to get really quality research out of Space Station, which was
our overall intent.
The other thing is that we really honored all of our commitments to
all our International Partners, and all of their hardware is on orbit.
That was also tremendously important for them. There were lots of
debates between myself as [ISS] Program Manager in Houston [Texas]
and Mike Griffin up here. He sent a group down to restructure the
entire launch sequence and cut the number of flights, so I had many
interesting discussions with the team about how they were going to
do business in a new way, and we weren’t always thinking correctly.
In the end, we ended up with a plan that was executable, and we’re
moving forward.
Wright:
Do you recall some of the creative ways that you were trying to possibly
resupply Station?
Gerstenmaier:
We looked at things. First we had to change the logistics stream,
so we had to repackage hardware. Large Orbital Replacement Units [ORUs]—we
knew they could not be returned, so they had to be redesigned. One
thing we’ve done that recently occurred was we upgraded the
communications system. There were eight individual Orbital Replacement
Units, think of it as eight avionics boxes. We now have one, so that
got replaced with modern digital equipment. We redesigned a pretty
complicated, pretty integral system into a single package.
For ammonia, the intent was to bring up large ammonia tanks and large
ORUs to replace ammonia. Now we had to make the ammonia system reserviceble,
so we had to put a disconnect on it. Same thing with oxygen. We used
to just change out the huge, big oxygen tanks on the outside of the
airlock. We could not do that anymore, so we had to essentially put
a quick disconnect on the side so we could recharge them. We didn’t
have the capability to bring high-pressure oxygen up, so now we have
an oxygen recharge system and a compressor that actually raises the
pressure from supply tanks.
There was a ton of work of taking a Station that was designed to be
reserviced and operated with the Shuttle in place, to the new system.
The big changes were really in the oxygen system, the nitrogen system,
and the communication systems. All of those had to be redesigned to
accommodate some new, smaller transportation system.
Wright:
Share with us how you formed the COTS program office, and what were
your expectations?
Gerstenmaier:
About the time that COTS came along, Mike Griffin asked, “Could
we take a look at doing a new, innovative, and creative way of trying
to get cargo transportation?” At that time there were two separate
directorates here up at Headquarters. I came up in 2005, and I took
over the Space Operations Mission Directorate [SOMD]. At that time
[Scott J.] “Doc” Horowitz was in charge of the Exploration
Systems Mission Directorate [ESMD]. The way it worked was SOMD did
operations, and ESMD did development. The COTS program actually lived
under ESMD, under the other directorate, not under myself.
Since I was going to be the recipient of whatever they developed,
I was involved pretty extensively in putting together the COTS office
and seeing what we could do. The idea was to try a totally new approach,
where we would essentially see if we could develop, in a simple way,
services, which we would eventually acquire, to provide cargo. As
the Shuttle goes away, we needed a way to get cargo to Station. The
idea was, could we do very lean development with industry paying for
most of the development? Then we would eventually acquire services
from that development activity. By services, that’s transportation
and cargo up, and maybe a little bit of cargo down.
We created the COTS office under the ESMD, and Alan [J. Lindenmoyer]
was appointed to go do that. He created a couple of teams to look
at innovative ways to pull this together, with the legal community
and the procurement community. He looked at Space Act Agreements and
cost sharing and other things. If you look at the first initial agreements,
the $500 million, a lot of that was associated not so much with the
technical side, but if these companies had sound financial plans.
Were they able to move forward? It took a lot of creative thinking
on Alan and the team’s part to pull this together. They actually
brought in some business folks who were familiar with commercial startups
and could evaluate and move forward. That was the beginning of the
COTS activity.
Wright:
You had worked with Mr. Lindenmoyer before. This was going to be a
new way of looking at things—were there certain attributes that
you felt he would be able to bring to this new program?
Gerstenmaier:
Yes. Alan had done some traditional procurement activities for me
in the past, and he ran the Source Evaluation Board for some contracts
under Space Station. Alan had an excellent understanding of what it
took to put together contracts. He had an excellent ability to work
with a team, to make sure that they actually got through this traditional
procurement activity in a good fashion. He did an extremely good job
of managing that activity. He had worked earlier in the Station Program,
so he really knew the Station’s basic requirements and what
hardware was needed, how the basic Station operated. He had a really
deep understanding of what we required. He had the ability to lead
a typical procurement team.
I would say the third strength he had was that he was pretty innovative
and creative. He has a unique way of looking at things. He looks for
creative solutions that I might dismiss as not being practical or
prudent, but he sees as a path going forward, and I think that’s
good. There’s an innovative side there, there’s a creative
side, but he also had the ability to actually execute. If you’re
just totally creative and you don’t have any process behind
you, then you’re creative and nothing ever happens. If you’re
creative and you have enough business sense, you can build a decent
process. You can actually end up with something you can use.
Even though it was going to be under Doc Horowitz, I had a lot of
discussions with Mike Griffin about, “Was Alan the right person
for this job?” I remember some great discussion I had with Mike
where I finally told him that if he really wanted this program to
be successful, he needed someone with the skills and abilities that
Alan had, or it wasn’t going to happen. If he would’ve
picked a typical NASA person, they would’ve ran into the first
roadblocks, and looked at the financing and looked at how little funds
were available and said, “There’s no way this would ever
happen.”
You needed somebody that wasn’t constrained by the thought process
that was pretty open, pretty innovative, yet had enough business sense
that they could actually pull together an organization and pull that
off. That was Alan.
Wright:
When the COTS program office was being formed back in 2005, was it
seen as a viable resupply option? Or was it being put together as
a contingency if other areas were not going to be there?
Gerstenmaier:
I think it was looked at as a high-risk ability and a way to potentially
provide cargo to ISS. It was seen as a way we could explore and see
what industry could do. It was seen as high risk, and whether it achieved
success or not, it wasn’t as critical as it could be. There
weren’t really a whole heck of a lot of other options. Even
though we treated it as not being absolutely required, it soon became
pretty important that it actually had to really deliver and move forward.
There were hard decisions through the process. Rocketplane Kistler
did not produce and did not deliver, so they ended up being terminated
and removed. They didn’t meet their financing gates. Doc gave
them numerous chances to try to redeem themselves from a delivery
standpoint. Then when it became inevitable that they weren’t
there, they were able to actually stop that activity and bring Orbital
[Sciences Corporation] online. That worked out well.
Again, it showed that there wasn’t 100 percent success here.
The market may not be there, the development activities may not occur.
This was truly a high-risk venture. We didn’t have a lot of
other options. I will tell you that I kept other options in the background
just in case. They weren’t pretty. We could’ve potentially
extended Shuttle for some period; we could’ve done some other
things outside with some providers. We were pretty committed to this,
but it was seen as high risk and it might not come through, so we
need to be prepared with some kind of backup just in case.
That was basically the way that COTS started. If I go back and reflect
on it, when we started it was a small amount of money in the big scheme
of things, the $500 million that we invested in this activity. It
was seen as potentially high payback, but also whether it could occur
or not was much less than certain.
Wright:
What were the thoughts moving forward with these being under Space
Act Agreements, versus the traditional FAR [Federal Acquisition Regulation]
procedures?
Gerstenmaier:
I think the idea with the Space Act was that it would allow us to
work kind of hands off. It allowed the developers to develop at their
own pace and in their own way, without a lot of NASA involvement.
It provided them some funding, but it also required them to provide
a lot of their own funding. If you look at the early milestones, they
were more funding milestones based on could they actually raise capital,
could they actually move forward. Were they actually viable companies?
Were they doing the design? It had a technical piece, but it was more
were they actually viable and was there potentially a business base
for them.
If you look at Space Acts, they’re good if we’re trying
to potentially enable an industry for a service that we don’t
need. If we—NASA, the government—need the service, then
we ought to be looking at a contract mechanism. At that point, we
didn’t actually need the service. It wasn’t required.
We still had the Shuttle, we still had [Russian] Progress and [European
Space Agency] ATV [Automated Transfer Vehicle] and [Japan Aerospace
Exploration Agency] HTV [H-II Transfer Vehicle] to resupply Station.
We were okay from a resupply standpoint, but this was something we
wanted to investigate, and the mechanism to investigate is the Space
Act. I think it’s the appropriate instrument for us to do this
investigation.
Wright:
In December 2008 the Commercial Resupply Services [CRS] contract was
awarded, and you were the Selection Authority. Can you share with
us the timing of that, and why it seemed to come earlier than most
people had expected it to?
Gerstenmaier:
There was a lot of discussion about that. Ideally when we envisioned
this, we would’ve run the COTS program under Space Acts, they
would’ve flown their demonstration flights, and we would’ve
waited a period of time. Then we would’ve done a typical Request
for Proposal for services contract, and then awarded the contract.
The problem was that we were dictated the Shuttle Program was going
to end in 2010, and if we didn’t move out with some kind of
services contract there was going to be no ability to resupply the
Space Station. This is where it became serious. We absolutely needed
this service; we were destined to retire the Shuttle. They had picked
how many flights we would have, which was a finite number. Later I
got those increased, but at that point there were a smaller number
of flights, so we had no choice. If we were going to deliver, we needed
to go do the services contract, move out, and move forward.
The other thing that I think is important is that there was no relationship
really between the COTS activity and the CRS [Commercial Resupply
Services] activity. There was no requirement under CRS for us to pick
the providers from COTS. It was a full and open competition. Anybody
that had worked on any kind of services that could provide cargo capability
to ISS were viable candidates for that. There was no tie between the
two. Sometimes you’ll hear it even talked about today, “Why
didn’t the COTS demonstration flights occur? Are those required
before you go do the CRS flights?” They are not.
We could go directly to the CRS activity right off the bat, even without
COTS. There wasn’t a tie there at all. Maybe in a past performance
sense it might’ve been there, but it was really weak. This was
a full-up competition on its own, totally independent from COTS. Again,
as I described earlier, when you have a Space Act it’s when
you’re enabling an industry. You’re getting a new development
group of individuals or companies together that can provide service
for you and other non-NASA customers. Then when you actually need
services you go in and do the contract. That’s where CRS came
about.
The other thing that occurred during this timeframe was that somewhere
in there, we did the COTS manifest assurance funding, which is roughly
$300 million we added in on the existing Space Acts. That was again,
separate from all of this other activity, but at this point we determined
that if we were going to really have this industry built, there are
some things that they probably ought to be doing. We looked at where
they had not done some things. In the case of one of them, they didn’t
do any thermal vacuum testing; they didn’t do any EMI [Electromagnetic
Interference] testing. They didn’t think it was necessary, and
we thought it was. We were able to, under COTS assurance, have them
go do some activities in that area.
In the case of one of them, we put an extra flight in where the rocket
would just fly by itself without the capsule on top going to Station.
We thought that was another assurance measure. These things we would
say are not absolutely mandatory, but from a prudency standpoint our
experience base has been that you ought to do these things. We gave
them extra funding to go do that. We gave them some idea, “Hey,
we want you to do these other things.” They provided some stuff
to us, and we said, “Yes, these are the things we’d like
you to do.” It turned out that was tremendously important.
I don’t think we would’ve had the success we had with
COTS if we had not done some of that testing, especially in the EMI
area. There were huge problems in one of the vehicles in terms of
EMI that was discovered during that testing. The thermal vacuum tests
didn’t yield much new information. They may not have been mandatory,
but it’s clear that the EMI test was. I would say again, that
was another contributing factor to the overall success of this program.
If we would’ve just stayed with the $500 million and we would’ve
had them try to fly their test flights and their demonstration flights,
I believe we would’ve seen a much higher failure rate. That
assurance money was pretty important, that got added to the COTS program.
Wright:
That augmentation was a bit novel in the fact that some people say
that NASA asked for it, and then others will say that NASA had the
opportunity to have this money. Can you give some background on how
you were able to secure those funds, to be able to reduce those risks?
Gerstenmaier:
Again, from my perspective—the way I would describe it is that
when we started the COTS program, we had the $500 million like I described
earlier. We weren’t counting on success for this program. If
it didn’t work and it didn’t deliver anything, no harm
no foul. At this point now, Shuttle was definitely going to be retired.
We didn’t know exactly when or how many flights, but it was
going to be retired.
The game had now changed a little bit. Whereas before it was a “nice
to have,” it was becoming now, “This better be really
successful.” Then our argument was, from a mission assurance
standpoint, to improve the probability of success we wanted to invest
this additional $300 million in the COTS program. It was the Exploration
[Systems] Mission Directorate’s act to do that.
We thought it was in the best interest of the government to put those
funds out. The way we described it to the Congressional folks was
that this money wasn’t absolutely required, but if you were
really prudent and you really want this capability, we believe this
funding is required to go do these types of activities. They’re
not mandatory, but they are really close. If you want mission assurance,
or you want a chance to make sure that when these things fly, they’re
going to fly with the minimum amount of risk from early failures,
you want to do some of this additional testing.
That’s where those items came from. They were described as truly
mission assurance, and I think that’s the way we described it
in the official documentation. These were things that we didn’t
consider mandatory, but they were important if you really wanted to
have a high probability of success on the early flights.
Wright:
You mentioned Congress, and I’ll just segue into that for a
minute. I know that you’ve had to testify over these last few
years about a number of things, but the commercial aspect continues
to come up. When you first introduced this concept, did you feel there
were advocates for NASA to help fulfill its charter with starting
these new ventures with these public/private partnerships?
Gerstenmaier:
I would say that at the very beginning, and even today, there was
not a whole lot of support. It’s a different way of doing business.
“If the market is really there commercially, why can’t
these companies do it on their own without any government funding
at all?” There’s a general feeling within Congress of
that. I think when we started this program, it was seen as not being
a very large investment in the big scheme of things. The probability
of success was not seen as mandatory, because the Shuttle could still
be around. Folks at that time were still advocating for continued
Shuttle flights.
Congress more or less tolerated it at the beginning, but didn’t
really accept it. There was nobody clamoring and saying “This
is something we ought to go do.” Even within the administration,
the administration at that time was not driving us to go do this.
This was something that we thought was prudent to do, to see if there’s
a different way of acquiring services. People look back on it and
they see some brilliant guidance, and everybody takes credit for the
success and they disavow all knowledge of the failures.
Looking at it at that time, and looking forward, there wasn’t
a whole lot of support for all this stuff. We thought it was a prudent
thing to do, it wasn’t a big investment, and we could move forward.
Then it became more serious and we added the additional funds, the
assurance funds. It was not easy adding those funds. Some folks say
that’s a 60 percent increase in the original program cost. They
see that as a big increase, but I saw that as the focus had changed
a little bit. Development of this new industry was going to be critical
to us in the future. It was time to invest a little bit more money
to keep that moving forward.
The other thing was the schedule took a lot longer than anybody ever
predicted. If you look at the original proposals, they’ve been
flying for four or five years now. They were fully established by
now, and they’re not. Orbital’s just coming online. Their
demonstration flight to ISS will probably be in August or September
of this year, pending we get through some launch-range stuff. Then
SpaceX [Space Exploration Technologies Corp.]—their next flight,
their third flight will probably be towards the end of this year.
There’s still a lot of activity occurring. They’re still
not in a repetitive, reasonable flight rate. They’re still both
in startup [phase], there’s still a lot of risk in the program.
It’s okay, but it’s still not where you would really want
it to be with this $40 to $60 billion asset called Space Station that
is absolutely dependent upon this capability. We’re still in
a very high-risk posture; the jury is still out on how this occurs.
I wouldn’t be surprised if there was a failure somewhere along
the line in either one of the two programs. How we react to that as
a government is going to be absolutely critical. If we stand down
for an extended period of time, that’s going to be not acceptable.
We need to accept the fact that there’s potentially a failure
here, fix it, and then get back to flight as soon as we can.
We’re able to do that because we deemed cargo as disposable.
The components we’re flying are items that if we lose them,
we can replace them. They’re not so valuable, like a one-of-a-kind
unique satellite. They’re not nearly as valuable as human life.
We have a different degree of freedom here that other programs don’t
have. Going back full circle, I think the program started out as,
“We’ll just see what happens,” and then it got “We
need to get a little more serious.” That was the COTS assurance
injection. Once we put the services contract in place, then it was
“no kidding, we need this service” and we’re moving
out in a more traditional activity to go do it.
To come into Station, we have to show that you cannot damage Station.
It’s a different requirement. The asset responsibility is totally
on the contractor. The term responsibility is totally on the contractor.
Only when they get into the [Keep Out] Sphere around the Space Station
do we get involved with the requirements. All we have to do there
is show from a mission safety standpoint that they can’t damage
Station. You can design systems that if this box fails, or this component
doesn’t work, or this sensor doesn’t work correctly, you
can abort out. Okay, the cargo didn’t get there, but that’s
acceptable. The cargo was disposable to begin with, that’s okay.
Station is protected. We have a very nice, succinct set of requirements
that we on the government side can enforce to make sure that we protect
the asset that we care about, which is Station.
Whereas when you then expand to crew, it’s a different game.
Now NASA needs to be involved in the ascent piece, because we have
to take care of the crew. NASA has to be involved in the orbit piece,
NASA has to be involved in the descent piece. It’s much more
complicated with crew. Mission success and safety are 100 percent
linked with crew. For cargo, safety (protection of ISS crew and facility)
can be protected and mission success (cargo delivery) sacrificed if
required.
The other thing is that also with crew, you lose that option of just
aborting. With the crew, mission success includes returning the crew
safely. The demands for crew are much more rigorous than they are
for cargo. In the cargo case, all I’ve got to do is not hit
Station. In the crew case, you’ve got to return the crew safely,
and you’ve got to protect them all the way from launch, all
the way through entry.
It’s not fair in any way, shape, or form, to compare what we
did with cargo and what we’re potentially going to do here with
crew. They are very different programs. Again, in this town, folks
see them as exactly the same and they don’t understand why the
requirements aren’t the same. You would not start a program
out, I don’t believe, the way we did with cargo. We’d
essentially be hands off and all we had to worry about was when they
came into Station that they protected Station. I think it was a reasonable
approach for us to do on cargo. We learned a lot by doing it, and
learned a lot from the way we acquire services. That general learning
is applicable to crew, but the safety requirements and environment
are very different.
Wright:
Most of the COTS program office like to share that when they entered
into this new area, it really was a new way of doing business. Again,
a lot of that was supported by the Other Transaction Authority to
allow them to do it with the SAAs [Space Act Agreements]. Do you think
in the future that’s going to be another avenue? Or do you believe
that most of what you’re looking at, working with the commercial
sector, is going to have to go back underneath the traditional FAR?
Gerstenmaier:
Again, as I described earlier, if we’re just enabling an industry
and we’re doing those things, Space Acts are the way to go and
this Other Transaction Authority is the way to do it. Once we need
a service, then we need to go into the typical FAR-based service kind
of activities.
Wright:
Certainly not asking you to look into a crystal ball, but do you believe
that based on what NASA has invested in this partnership, that these
markets will be able to develop in the future for other customers
for them?
Gerstenmaier:
I think one key role Station can play is the proving ground for other
commercial companies. Under the Center for Advancement for Science
in Space, the CASIS activity with Station—we’ve asked
them to reach out to more traditional companies that do terrestrial-based
research, like pharmaceutical companies, or potentially materials,
companies that manufacture materials or alloys. Lots of things in
the biology area, the human area. The idea for CASIS is to go out
to these commercial activities and see if they have an interest in
doing space-based research. When you go to microgravity, genes and
cells express themselves in a very different way than they do on the
ground. We’re not sure exactly why, but they do.
For example, you can fly salmonella to space. The genes mutate in
a different way in space. They actually become more virulent, or more
disease causing. You can then look at that, determine which particular
gene turned on, which turned off. Then you can actually return a sample
to the ground, and through genetic engineering you could knock out
selected genes and then actually create, essentially, a vaccine for
salmonella. What’s intriguing is that you don’t actually
do the manufacturing in space; you use the space environment to show
you a different way that the cell performs. Then by taking that knowledge,
you can apply that with terrestrial-based genetic engineering to actually
engineer a vaccine.
I liken it to when they went to the jungles of Africa to look for
other potential pharmaceuticals, and they went out and grabbed plants.
They would inject them to find out what they would cure, or not. There
was nothing special about Africa, but it was just that the stuff was
a new environment. They got a chance to look at a new chemical compound,
a new way of doing things that actually had healative or protected
the body kind of effect. We can do the same thing in space. If we
can get somebody to go talk in a way that pharmaceutical companies
can understand, then they can go test things in space.
The other thing that occurs in space is that muscle atrophies, or
weakens, because it’s not used. That’s indicative of what
happens in the elderly, so there may be some pharmaceutical remedies
that can occur there. We can fly some animals to space, and actually
try new candidate drugs on them to look at muscle wasting and bone
loss. A lot of different things. Another one is the immune system
is not as effective in space for some reason. That’s another
way you can now look at things that actually improve the immune system.
The idea is that we can potentially fly animals and rodents to look
at that. Pharmaceutical companies can then test very quickly in space
and see whether this drug is effective or not effective. That can
inform their decision on whether they want to go into Class III FDA
[Food and Drug Administration] trials on the ground. This is a very
quick way for them to determine, “Does this drug have enough
promise to invest tens of millions in research, or something that
just doesn’t look like it’s going to pay off?” You
can use microgravity as that truth of “Is this a good drug,
or not a good drug?” to move forward.
The idea is to expose a bunch of folks that are not familiar with
what happens in microgravity to the unique properties of microgravity.
Have them use what they understand, terrestrially and building stuff
on the ground, and say, “If I can take advantage of this new
test environment, I can actually get an economic advantage over all
the other companies that are not testing in space.” Then maybe
that kicks off a new economy in space. We’ve got the transportation
market established through cargo, and we’ll have a crew transportation
market established. Then we’ve put the basis together of another
new economy in space.
If I dreamed a vision, it’s that Station allows us to experiment
on a very low-cost basis with a lot of commercial companies. The commercial
companies get excited and it’s no longer the government saying,
“We need to go to space to go do research.” These commercial
companies say, “I need to be in space to have a global competitive
advantage over other companies.” Then we’ve also got to
enable the transportation market for them to go realize that. That’s
nirvana for us. They’re in low-Earth orbit, the government’s
not investing. The government is now moving on beyond low-Earth orbit.
We’re out in the vicinity of the Moon or beyond. We’re
heading towards Mars or asteroids, and pushing that next series of
boundaries.
We’ll see how all of this plays out over the next 10, 20 years.
Station plays a very key role in showing the market is there. We can
do stuff today on Station extremely quickly, we can do it in a matter
of months. Pharma wants to do something different, Station’s
already established. We can go do it through the CASIS organization,
we’ll go fly it, and we’ll get results back in a couple
of months. We can answer things on a pace that commercial companies
are used to seeing, so we’ll see if this pays off, and if all
this works or not.
Wright:
Sounds like a good plan to me.
Gerstenmaier:
It’ll be interesting. Life’s never dull.
Wright:
It’s a continuation of what you started so many years ago. Are
there any more thoughts about the COTS program? Any regrets? You wish
you would’ve done something different, now that you can look
back and see what’s been done?
Gerstenmaier:
I think in the end it was okay. You can always refine stuff when you
look back a little bit. I think the important things to take away
were that COTS was really not related to CRS, and I didn’t really
do CRS because I wanted to do CRS when it occurred. We had no choice.
I don’t think others fully realize that. When they told us the
Shuttle Program was shutting down, that was tremendously difficult.
That forced a lot of decisions.
We were luckily able to get another Shuttle flight, STS-135 added
in, which was critical, because the cargo providers were late in coming.
If we wouldn’t have had that flight, we would’ve been
in a posture where we probably would’ve had to reduce crew size
on Station. It would’ve been a different posture. We were really
lucky we were able to get that flight, and we were able to keep that
option open for an extended period of time. We actually got four additional
Shuttle flights beyond the original commitment. That was not an easy
thing to go do. I worked amazing processes to pull that off with our
team. Luckily folks were not too picky, but they didn’t look
too closely and kept options open. They worked out well.
We’ll still see how it happens, whether these guys really come
online. Like I said earlier, there’s probably a failure coming,
and how we react to that failure will be extremely critical. We lost
a Progress about a year and a half ago, and we recovered from that
very quickly. Hopefully we can do the same thing if we have a cargo
failure. The other thing too is that I don’t think folks realize
how difficult this source selection was for this CRS contract. You
know about all of the protests.
Wright:
Would you like to share some perspective of trying to put that together,
with all of those complexities?
Gerstenmaier:
It was not easy, but life is never easy. We made the selection, and
we immediately got protested to GAO [Government Accountability Office].
Then the first point was, did we want to get an [automatic] stay.
Typically what happens when a protest is filed, it stops all work
on the contract. Then we had to go to GAO and make an appeal to continue
work even though we were being protested. That was not easy.
If you look at the logic, what I described earlier, I didn’t
want to do this procurement anyway, but I had to because of the time
criticality. Now to take a delay for a year to deal with this protest
would’ve stopped all work on the cargo activity for a year.
This makes absolutely no sense. This is exactly what you don’t
want to do. We had to articulate all that in writing to GAO, and luckily
GAO was understanding enough and understood our logic, and read through
it, and said, “Yes, this is right. They need to keep moving
on.”
We were able to continue on with the two contractors, with Orbital
and SpaceX, while we were still dealing with the protest, which took
about a year to get resolved. That was really hard. I had advice to
find some way to compromise to satisfy the intent of the protest,
but it didn’t make sense. We didn’t have the resources,
we didn’t have the funds. I was pretty clear in my source selection
statement of what my rationale was, and I believe it was the best
decision I could’ve absolutely made with the data. It wasn’t
biased in any way, shape, or form. I was ready to go defend that,
but the consequences of us not winning could’ve been a real
mess to us in the future.
My life is full of risks, so what’s another one, right? We just
moved on and went through that process. I spent an inordinate amount
of time getting ready for the GAO testimony, and spent eight hours
I think on the stand with GAO. It was hard, but it’s what I’m
supposed to do. My logic was there. In hindsight, the miracle was
that with help from others, we wrote a very sound source selection
statement. I learned that from previous procurement activities I had
the privilege of selecting. It’s really important that those
things are written well, and your logic is there, and it’s sound
and defensible.
It’s not much different than what I do in my everyday life,
when I go to a Flight Readiness Review and I commit to a Shuttle launch
with crew members’ lives on the line. I know their kids and
their wives. There’s probably no more serious decision I ever
make in my entire life than those kinds of activities. I treat these
procurement activities exactly the same way. If I’m going to
make a mistake, it’s an honest mistake. It’s not because
I didn’t listen to anybody, and it’s not because I didn’t
pull together all of the important information I believe to make the
decision. Now hindsight may reveal that I missed some piece of data,
but it wasn’t for lack of trying and searching. We worked hard.
Out of all of that I learned that if you really write down succinctly
what your logic is and what your rationale is, it’s there. Some
people trivialize the fact that we picked two contractors for cargo.
That was not an easy decision. I had a choice to stay with one or
two. I still don’t know if that’s the right decision yet.
We’ll know somewhere in the future. We need both of them. We
need 40 metric tons to be delivered to Station between now and the
end of the contract, as the minimum. We need each contractor to deliver
their 20 metric tons, so I need both Orbital and SpaceX.
We’ll see if that was a good thing, or it was a bad thing. It
might’ve been better to pick one, but the logic basically was,
I wasn’t smart enough to know which one was really going to
be there and I wanted some backup capabilities, some redundancy in
delivery. Whether that was smart or not, or you would’ve been
better off placing all our resources on one and all our effort in
making sure that one was successful, it’ll play out in the future.
I think some of this stuff in hindsight gets perceived as being easy
and it’s obvious that these decisions were made. There’s
speculation as to what political motivation made these decisions.
I can tell you all the stuff that I’ve been involved with, that
wasn’t there. They were not easy, and there was no other motivation
than to try to do absolutely the best thing for this government, for
NASA, and for space exploration. Those fundamental underpinnings are
there, and time will show how well all of this stuff worked out.
The other thing I would say in closing is that I have an unbelievably
great job, and work with phenomenal people in this Agency. I think
a lot of people share the same passion, the same desire for excellence
that I do. If I can explain a problem to them, and I can step back
and stay out of their way, I’m continually amazed by what this
team will accomplish and what they can go do. There are things that
I can see absolutely no way that this is ever going to work, but this
is what we have to go make work. If I can articulate it with the right
constraints to them, and then step back, the teams can absolutely
100 percent deliver.
To me, that’s just an unbelievably great blessing to work with
folks who are that dedicated, that talented, and ready to move out
and do things even though they may not even see a path through the
wilderness. I think that’s what makes us great as a nation,
and that’s what makes this Agency special from other agencies.
You’re either wired this way or not.
There are those extra credit problems in the textbooks that don’t
have an answer. There’s some folks that, man, you can’t
hold them back from those kinds of questions, those problems. Somehow
I’m kind of wired that way. That’s what I like doing.
Wright:
Which is good, because it seems like you’ve had an extra quota
of extra credit problems lately. It’s good you’ve got
a lot of practice. Thank you for everything you’ve offered,
and good luck with everything coming up.
Gerstenmaier:
All right, thanks.
Wright:
Thank you.
[End of interview]