NASA Johnson
Space Center Oral History Project
Edited Oral History Transcript
Kenneth
R. Haynes
Interviewed by Sandra Johnson
Las Cruces, New Mexico – 21 January 2003
[The
questions in this transcript were asked during an oral history session
with Kenneth Haynes. Mr. Haynes has amended the answers for clarification
purposes. As a result, this transcript does not exactly match the
audio recording.]
Johnson:
Today is January 21st, 2003. This oral history with Kenneth Haynes
is being conducted in Las Cruces, New Mexico, for the NASA Johnson
Space Center Oral History Project. The interviewer is Sandra Johnson,
assisted by Rebecca Wright and Jennifer Ross-Nazzal.
I want to thank you for joining us today and agreeing to participate.
I’d like to start out by asking you to give us some background
on your career before you joined NASA.
Haynes:
My procurement career started when I was called to the Air Force in
1955, reported to Wright-Patterson Air Force Base [WPAFB] Ohio, and
worked in the F-101 Project Office as a Production Procurement Officer.
We bought F-101 aircraft, which was the first supersonic weapon system
in the Air Force at that time, and it was the largest dollar expenditure
in the Air Force. I worked at WPAFB through the total program until
it was transferred to Warner Robins, Georgia. The F-101 was to support
SAC [Strategic Air Command].
In 1960, the ballistic missile centers were just opening. They came
to WPAFB—that was old Headquarters AMC [Air Material Command],
which was worldwide procurement for the Air Force. Most of the experienced
procurement people in the world were at WPAFB. They came and offered
all of us, or any of us that were willing to go to the missile centers
a one-grade promotion and we could select the site. With that, I elected
to go to [BMC] Ballistic Missile Center, which was in Los Angeles,
California.
I worked there as Procurement Specialist, responsible for the communications
for the Atlas missile sites, and I was there until Major General Robert
E. Greer, who was assigned from Washington to head up the Special
Projects Office, asked for volunteers to come work with him. He needed
four buyers and I thought that sounded interesting, so I accepted
his offer and went to work in Special Projects.
I transferred to the NASA Marshall Space Flight Center for about six
months. I worked there in the Saturn Office; I went back to the Special
Projects Office and worked there until I came to NASA White Sands
Test Facility, New Mexico. I was with NASA from that date until 1981.
Johnson: What were your initial impressions when you came out to Las
Cruces, about the facilities?
Haynes:
Since the Huntsville move wasn’t what I thought it would be,
I decided I would not go anyplace until I looked the site over first.
The individual who was Chief of Administration I had met back at WPAFB.
He worked in the Personnel Office at JSC before he came to WSTF. He
knew my background from WPAFB, BMC and through Special Projects, so
he was aware of my capabilities..
He called me, said he needed me, and wanted to know if I would come
to WSTF. I told him no. I had driven through Las Cruces twice, and
I couldn’t remember coming through the town, so I thought it
must not be a very impressive town. I told him I was not interested
but he kept calling me until he finally caught me on a bad Friday.
I told him I would not come unless I could look the place over first.
He said, “Well, what time does an airplane leave LA tonight?”
I got on the plane and he met me in El Paso, Texas about midnight.
We drove back through the range, which was about forty miles from
El Paso, up through the White Sands Missile Range [WSMR].
The
only thing we saw coming from El Paso were a few coyotes running across
the road and some snakes on the road. We came across the hill from
WSMR to the little town of Organ, New Mexico to the entrance of WSTF.
He wanted to show me where our site was going to be. The road was
unpaved from Route 70 up to our site, which was about five miles.
At the end of the road was a trailer, which housed one guard and there
were no other facilities. That was it. Then we came into town of Las
Cruces and some of the streets within the city were still unpaved
There were even some outdoor privies. Had one stoplight in town, which
was at Picacho and Main Street. I was not too impressed. I told him
I would go back home and think about it. I finally decided to accept
the position.
Johnson:
How many people were here when you started?
Haynes:
I was number six.
Johnson:
You were definitely there at the beginning.
Haynes:
I was there at the beginning.
Johnson:
What were your duties, as you understood them, when you started in
your position?
Haynes:
I was responsible for Procurement and NASA Property. There were two
other individuals in the office.
Johnson:
What sorts of activities were going on at that time, or had anything
started up here, or were you just trying to get things sorted out
and get things started?
Haynes:
They had begun. A maintenance and operations contractor has been selected,
and he was on board, but there were no facilities. The White Sands
Missile Range provided us office space on the range. Of course, they
invited us to use their facilities, which included the use of their
clubs, Post Exchange and housing, if available. Our maintenance and
operations contractor was not authorized to perform any work on the
range.
The Little Joe II project was under way, which flight-tested the Apollo
escape tower. We launched from Complex 36 on the range. There were
very few records when I came on board. As I indicated earlier, I almost
decided to go back home.
The one individual was supposed to be handling the property and the
other who had come from the Personnel Office had very limited experience
in their fields. I asked where the records for the property were,
and he opened the desk drawer and said, “Well, I think there’s
some in here, and maybe there’s some over there”. I said,
“How much property do you have?” He had no idea how much
property we had. I asked where the records on the procurements were.
He didn’t know. He didn’t know who bought anything.
I found out we were immune from GAO audits for the first two years.
Frank Clark had come over from WSMR so he knew everybody on site.
I asked him if he could get some of the Army people who worked in
property to perform an inventory for me. The Army agreed they could
do that if they did the inventory on other than regular work hours.
So we had to pay them overtime. Worked overtime in the evenings and
weekends until I got an inventory of the property, which was the base
for starting with property control. We had to develop procurement
procedures primarily based on past experience. We started with the
basic purchase order. It was quite interesting though.
Las
Cruces was a quiet little town, and not any of the vendors in town
were used to NASA type requirements. They were used to the Army. If
one wanted a common item, they might be able to provide that but if
you wanted something less common, they could get it for you in maybe
two to six weeks. For example, there was only one electronic place
in town. I would call them and they would tell me they could get something
for me in two weeks. I would explain that we had a test launch and
needed the item within the hour. That was a problem we had to overcome.
We found an electronic business in El Paso who understood NASA requirements.
He would deliver the procured items, even those with a short delivery
schedule. That was the type of procurement environment we had to work
with.
Johnson:
You mentioned that you didn’t have any personnel. Were you able
to hire people at that time?
Haynes:
Hired Al Duran to head the procurement function. He was with me all
through the years, and later hired a secretary. It turns out both
of them were Spanish and later on when we had to hire a percentage
of minorities in our workforce, I almost met the requirement for the
whole site. But that was a continuous problem over the next couple
of years, to hire qualified people to meet our requirements.
Johnson:
So the numbers just gradually grew all the way through Apollo?
Haynes:
The numbers grew. Yes, I had the authority to hire all I needed, and
my supervisor didn’t question when I told him what I needed.
At the peak, we had twenty-one in my office, and when I left, it was
back down to seven or nine, which was actually a little bit less than
minimum, in my opinion.
Johnson:
You mentioned that Las Cruces had some dirt roads and the vendors
weren’t used to having to deal with providing things quite as
quickly as you needed them. What sort of other effects do you think
White Sands Test Facility had on Las Cruces itself? Obviously, it
is a larger town now, but do you thank they had something to do with
that?
Haynes:
Oh yes, no question. The main industry in town at that time was the
university [NMSU] and Stahmann’s Pecan Farm. They had approximately
5,000 employees. It was the largest pecan farm in the world. Other
than that, we didn’t really have any heavy industry. I don’t
remember, but it was several millions of dollars that we added, particularly
in the housing industry.
Johnson:
What type of relationship did White Sands have with Johnson Space
Center at the beginning, or Manned Spacecraft Center, obviously, then?
Haynes:
The only way I know how to answer that, the Army was a well-established
DoD [Department of Defense] agent and they have a regulation for everything.
With the tight testing schedule, it was very difficult at times. Utilizing
their range, we had to conform to their rules. At times, there was
some stress, but on the other hand, they did support us, particularly
the Post Engineers who were responsible for all the work on the range.
If we wanted work done in maintenance and operations, we would go
through the Post Engineers, using their procedures.
I have a funny to tell you there. We’d moved into barracks—these
were old World War II barracks. A water fountain line broke. Water
was squirting out into the barracks. I called Post Engineers and told
them we needed a plumber fast, that a water line had broken. “Just
a minute. Yes, we can get that tomorrow afternoon, at two o’clock.”
You don’t understand, the water line is broken and the water.”
“Sorry, we can’t get to you until two o’clock the
next day.” I said, “Never mind, I’ll have Zia do
it.” “You can’t do that.” And about thirty
minutes, here came the Post Engineers to fix the fountain.
Overall, I’d say, under the restrictions and their regulations,
they supported us well. As a matter of fact, it got to a point later
on that they wanted to support us too well. Specifically, they wanted
to provide security at our site. Of course, we didn’t want that
and we prevailed. We hired our own security. Overall, I’d say
they did well, under the circumstances.
Johnson:
Having to share the facilities at the beginning, at what point did
the facilities, specifically for the test facility for your offices,
when were they built, and when did you get to move into them?
Haynes:
A year later. Building 100 was the first office building, and we completed
200 a few months after we moved. Of course, building the facilities
was a continuous thing. Have you talked to Archie Beckett yet? He
could tell you. He was in charge of getting the facilities ready.
I know it took us a while because we had lots of problems that he
has probably told you about.
Johnson:
When they were first building them, what sort of things did they provide
for the employees?
Haynes:
Just basically office space. Of course, we had a fire station, and
since we were remote, we were twenty-two miles from Las Cruces, we
knew the type of work that we were going to be doing and dangerous
materials that we would use. We knew we had to do something to provide
for the workforce, for example, hot meals. So, in Building 100, we
built a cafeteria. Medical services were quite lacking at that time.
We found out later that even the doctors in town didn’t know
how to handle accidents that we would have with the various propellants.
We built a dispensary and hired a doctor and a nurse. Our nurse was
the supervisor of nurses at the local hospital in Las Cruces at that
time. We hired the best talent that was available. It worked out great.
Later on, we provided bus service for the site, but that was a few
years down the road. We were so busy and had such tight schedules
to meet, you would have thought everybody was working for themselves.
Johnson:
If you could talk for a minute about the structure of the organization
itself when it first began.
Haynes:
We had a manager and four office chiefs, and the manager reported
to the Director at JSC. Each of the office chiefs reported to their
respective counterpart, which was a Division Chief at JSC. After about
a year of that, it was determined that wasn’t working at all.
JSC Director, sent his Deputy Director, George Abbey, out to review
the management structure. He came out and stayed with us about six
months, went back, made a recommendation, and based on that recommendation,
the manager was delegated authority from the JSC Director. The office
chiefs reported to the local manager, with one exception. I got my
contracting officer delegation from Dave Lang, who was the Director
of Procurement, JSC. I had the responsibilities of a contracting officer,
aside from my administrative support to the manager, and that got
touchy at times. The contracting officer’s responsibility is
clearly set forth in NASA regulations. You could see how that could
get to be a problem. But, never had a problem that we didn’t
resolve and get on with administrative tasks.
Johnson:
Tell us a little bit about your role in the Procurement and Contracts
Branch during the Apollo Program.
Haynes:
We had a requirement to build a warehouse early on and stock it with
supplies and spare parts to support the facility, and that got to
be quite a chore. That must have happened after the first two years
because here came the auditors [GAO] and criticized us for many actions.
We had an auditor from JSC who criticized us for awarding a contract
for a warehouse. He stated that we were wasting NASA’s money,
that we should not build a warehouse. The auditor had gone over to
White Sands and found a building that was available and said we should
utilize that facility.
With the tight testing schedules that we had, we would have had to
have driven twenty miles to WSMR and return. One would still been
trying to launch Apollo if we had not completed warehouse construction
and awarded contracts accordingly. We set up open contracts, or call
contracts, which we were authorized up to $25,000. With this type
of contract, we could phone and follow up in writing. This gave us
a fast turnaround on purchases. Anything larger or more dollar value,
we had to go through required competitive procurement procedure.
Johnson:
If the purchase was over $25,000, would you release a Request for
Proposal [RFP]? Can you just describe that procedure for the other
contracts?
Haynes:
Yes. This is one area that gave us some trouble. In the procurement
field, it depends upon the type of contract, dollar amount as to what
type of contract you write. Thanks for GSA contracts. If a contractor
negotiated with the General Service Administration [GSA] and they
had their products listed with a price they charged the government,
you could just place a call against that contract. We ordered everything
that we could through GSA contracts.
You asked me what I felt was one of my greatest accomplishments. I
think the greatest accomplishment of our office was we never had a
case where we were the cause of a test schedule delay.
Johnson:
Maybe you want to just talk about that just for a minute. Why should
you have been the cause of a delay?
Haynes:
We were working in the state of the art and in many instances beyond
the state of the art, as you were at JSC. We had to work with current
knowledge, and design and build our facilities, which we did, based
upon known requirements at the time. When I say “we,”
I include JSC and NASA Headquarters. But it turns out, as the schedules
developed and as we got into the testing phase, our facilities were
undersigned, particularly in the capacities to hold the liquids, the
propellants that were required.
If all tests had gone as scheduled with the propellants that we had
ordered, we didn’t have the capacity to unload them or to hold
them without paying excess demurrage charges. Thank goodness, we had
anomalies in the testing, which delayed the testing schedule, and
gave us time to unload the propellants.
Johnson:
There were a number of contractors and subcontractors working on site.
What was the relationship between the civil servants and the contract
personnel, as you remember it?
Haynes:
I think the relationship was good. I don’t know what the contractors
might have thought. We had a team that was just phenomenal. No one
there was concerned about hours of work, what time you got to work,
or when you went home. They didn’t ask for overtime, although
a few people got it. I think that we were respected and accepted.
We got along exceptionally well. I am sure we had small problems that
anyone in testing operations would have, but overall it was very good.
Johnson:
One of your responsibilities was to evaluate the prime contractors
and subcontractors while you were there. Can you describe that process?
Haynes:
Prior to the award fee type contracts, the office chiefs were responsible
for the evaluation of the contractor work in their respective areas.
These duties were delegated to the engineers and personnel who were
assigned to monitor the work in their areas of responsibility. After
award fee type contracts were issued, the evaluation process remained
basically the same except the criteria for evaluation was established
and issued as part of the contract. The evaluation consisted of both
objective and subjective criteria and was evaluated in a daily basis
with weekly scheduled meetings with the contractors.
Johnson:
At what point were the regulations in place?
Haynes:
It was an evolving type thing. They weren’t just sent to us,
the came to us as they were formulated. WSTF had a Procedures Board,
which was made up of the office chiefs and the manager. We wrote internal
procedures called WSTFIs [White Sands Test Facility Internal Procedures]
and as it became necessary or there were problems, we would write
a new procedure. The board met on a weekly basis to write new regulations.
JSCIs [Johnson Space Center Internal Procedures] were the implementing
instructions of the Headquarters, and, of course, we complied with
those as well.
Johnson:
Of course, Grumman and North American, being the prime contractors,
and you mentioned that the people that were there sometimes may have
felt like they weren’t sure about NASA having complete control,
but what type of relationship did your office have with them?
Haynes:
Excellent, particularly with North American, which was the most active
in the early stages. The manager from North American had a technical
background as most of NASA personnel. North American Administrator
understood what had to be done and he would come to me and ask, “How
can we resolve this?” We would resolve the problem between us.
We would go back to our respective managers with our solution and
attempt to convince them this was the way it should be done. That
is how we resolved many problems and the system worked beautifully.
Johnson:
Were there any other companies that you worked closely with on a regular
basis?
Haynes:
Yes, Grumman Aircraft. But those contracts were awarded out of JSC.
The Grumman Contracting Officer was Jim Neal, and Hank Wychek was
the Contracting Officer for North American. I really didn’t
have any problem from that standpoint, although I did stay in contact
with both Jim and Hank.
Johnson:
What about the relationship of the Procurement Office at White Sands
with other NASA centers and NASA Headquarters?
Haynes:
If I had a problem that I didn’t know how to handle, I usually
called J. P. Harris at JSC procurement office, or the legal office,
depending on the nature of the problem. They may suggest to me to
call either NASA Kennedy Space Center, FL or one of the other centers
who had handled similar problems. Other than that, we handled 95 to
98 percent of everything at WSTF or JSC.
Johnson:
Let’s talk about Apollo for a minute, the actual program itself.
Of course, the Apollo 1 fire. Can you tell us what kind of effect
that had on White Sands and your office in particular?
Haynes:
Yes. We were so involved with total requirements; we attended staff
meetings every week from the time I was at WSFT. Plus, I spent 50
to 60 percent of my time in meetings for almost the entire time. I
was involved with many aspects of the WSTF requirements and I knew
what was going on over most of the site. When that came along, we
had not done flammability testing. NASA was operating in 100 percent
oxygen environment, and we had not tested the materials, nor did we
have a requirement at that time to test flammability of the wiring
inside the command module. When that happened, the requirement was
given to the laboratory to perform the testing. Have you talked to
Dave Pippen yet?
Johnson:
No.
Haynes:
Dave is the individual you need to talk with. He did the flammability
testing. The laboratory developed the testing equipment. No one had
ever done that type of testing before, to my knowledge. Dave developed
the procedures for testing and then the lab immediately started performing
testing on the materials. JSC engineers would write what needed to
be tested and how they wanted it tested, and the environment they
wanted the testing performed. The laboratory then did the testing.
The only way it affected the Administration Office was added procurement
to support the testing. I didn’t see very much difference in
the way we were normally operating.
Johnson:
Even with building the test area?
Haynes:
The test areas themselves, yes. We issued the contracts on some of
the testing equipment.
Johnson:
There was a feeling of commitment in the whole facility to get it
working?
Haynes:
Oh yes, and it continued to be so up until after the Apollo Program.
It was quite a letdown after the Apollo Program. The work had been
quite exciting, and everyone was actually proud to be a part of it.
But when the Shuttle came along, we were interested in doing it, of
course, but the enthusiasm wasn’t there to the same extent as
in Apollo.
Johnson:
At what point did the unions come in, time-wise?
Haynes:
It was during the time Dynaelectron was the Maintenance and Operations
Contractor.
Johnson:
Was it during the Apollo Program?
Haynes:
It might have been at the end of the Apollo Program.
Johnson:
In 1968, Martin L. Raines recommended to George M. Low that they start
phasing down the contractor operations. What type of effect did that
have on the test facility and the morale and day-to-day activities?
Haynes:
Of course, we had people that were concerned. We had built up around
2,100 people at that time. We may have been a little overstaffed based
upon the current testing requirements. Past experience has shown you
start laying off personnel, productivity increases. I think we actually
saw a little productivity increase from the initial layoff. Morale
stayed high. We didn’t see any additional, significant problems.
Johnson:
In 1969, you headed the White Sands Test Facility’s Administration
Office.
Haynes:
Yes.
Johnson:
What changed as far as your job duties?
Haynes:
Just a lot more responsibility. The Administration Office was assigned
most of the non-technical duties. I had procurement, contract administration,
subcontracts; property and supply; budgets; financial management;
personnel; reproduction; travel; communications; transportation; and
mail service.
Johnson:
How many people did you have supporting you?
Haynes:
At that time?
Johnson:
Yes.
Haynes:
Including me, we had twenty-one people, which was minimal. I can’t
overemphasize this was a group effort, what I called a team concept.
We truly had a good team. They performed the work in an outstanding
manner with very little complaint.
Johnson:
How was the office organized? How were those twenty-one people organized
under you?
Haynes:
The Administration Office consisted of procurement, contract administration,
property, communications, transportation, mail, financial management
and budget, travel and site personnel, and other duties as assigned.
The duties were assigned to the branches, Procurement, Contract Administration
and Financial Management and Budget. Personnel and Travel were a staff
function to my office and Transportation and Communications were assigned
to the Property Officer.
Johnson:
Were there any personnel issues or anything that you can remember
during your time there that you dealt with specifically?
Haynes:
Yes.
Johnson:
Anything you want to mention? [Laughter]
Haynes:
If personnel from the contractors, Propulsion Office, Facilities Office,
or the Laboratory had a problem that they didn’t feel was being
addressed or solved, they came to see me. They knew their issue would
be kept confidential and every effort would be made to correct or
settle the issue. We tried to resolve a personnel issue in-house and
were very successful in doing so.
Johnson:
In 1970, I believe NASA planned to close White Sands. What were your
thoughts about that decision?
Haynes:
We all recognized that the time would come when the Apollo Program
work would be completed at WSTF. I was told not to expect to stay
more than five years at the outset. But when it came, we were very
concerned. I recognized that to close down a site, the people required
to do that would be personnel and property administration. I wasn’t
personally too concerned. I knew the office chiefs were going to try
very hard to get additional work, and I knew that the work we had
been doing was one of a kind and requirement would be needed to continue
NASA’s work.
Johnson:
You mentioned that they told you, when you first began, not to expect
to be here any longer than five years. Do you feel that that’s
the way they were setting this place up, as something that would be
closed down completely and not opened again, or just closed and then
possibly opened again?
Haynes:
No, I think at the time they made that statement, they felt that once
the testing was completed, they would close down the facility.
Johnson:
So a lot of people did go back to Johnson?
Haynes:
Yes. And, in turn, came back to WSTF later on. The current manager
is one of those. He started at WSTF, went to JSC and returned as manager.
Johnson:
How many people did the total number go down to at that time? You
mentioned it was, I think, 2,100 at one time. What it go down to?
How small did it become?
Haynes:
I am not absolutely sure.
Johnson:
You can give an approximation.
Haynes:
I am not sure of the exact number, but approximately 400.
Johnson:
That small?
Haynes:
Yes.
Johnson:
That’s interesting. Let’s talk about the Space Shuttle
Program and then how it affected White Sands and the workforce out
here.
Haynes:
As far as my office was concerned, if anything, we many have seen
somewhat less requirements come through our office, but it really
didn’t have any material effect on what we were doing.
Johnson:
Did the atmosphere change? You mentioned before that with Apollo everyone
had that goal in mind.
Haynes:
Yes, because this was the time that I told you that they brought the
unions in. If one directed a craft member to do work that was not
within the scope of his craft, he could not perform the work. Up until
that time, it didn’t make any difference if you were a carpenter
or a plumber, if you needed the work done, whoever was available did
it.
Johnson:
You mentioned in your list of duties, budget was one of the things
you were responsible for. So what were some of the differences between
the Apollo Program and the Shuttle Program?
Haynes:
We had developed a computerized cost-accounting system. All work was
defined by task. All the work done on the site was authorized by test
preparation sheet [TPS] or work order. When a requirement came in
to us, it was in the test area, we would issue a TPS. The Budget Office
used a funding number, assigned a task number, and every hour worked
would be charged to that task. The computer printout was issued on
a weekly basis.
Johnson:
During the seventies, the budget with NASA was shrinking, and you
had less to work with. How did you maintain your responsibilities
out here?
Haynes:
I guess, like all organizations. In our meetings with the office chiefs
and the managers, we reviewed all the work that had to be done and
ask, “Where can we cut?” Normally, you never got an unanimous
decision among the office chiefs, and in that case, the manager would
just make an arbitrary cut. Then if we got into trouble, usually,
you could get help. It was in everyone’s interest that each
office meet their responsibilities. I will have to admit , it was
cut pretty thin at times, but we always managed to meet our schedules.
Johnson:
You touched on, a minute ago, the reimbursable work.
Haynes:
Yes.
Johnson:
Do you want to talk about that a little bit and how that process worked?
Haynes:
When we received reimbursable work, the area that was to perform the
testing would come up with a budget, with estimated hours to perform
the work. If WSTF agreed that we could do the work within the budget,
we accepted the work. A task order was assigned and as work progressed,
all changes were made to the assigned task order number. Task order
reports came out on a weekly basis or were made available more often,
if office chief desired. This permitted the office chief to keep current
in trucking cost and performance.
Johnson:
What type of contracts were those? You worked with the Army and the
Air Force, too; is that correct?
Haynes:
Even though they were not specifically designated as such, they ere
in effect a fixed price type contract. Yes, we worked with the Army
and Air Force and some work with contractors.
Johnson:
In 1978, I believe, there was a reduction in force [RIF]. Do you remember
that?
Haynes:
Yes, I do. The RIF had very little impact as the net result. We had
a few volunteers to leave or transfer.
Johnson:
Was there any indication before it happened that this was coming in
your offices? Did you know it was inevitable?
Haynes:
We suspected it, sure, since I had the personnel function, I worked
closely with personnel. I pretty much knew what was coming. As office
chiefs, we were constantly going through personnel cuts with the contractors.
When we had cuts in budget, we had to reduce the contractor’s
workforce.
Johnson:
When you first started here, going throughout your career here, obviously
there was a lot of technological changes as far as the testing facility
and engineers and that sort of thing. How did the technology over
time, affect your offices?
Haynes:
Made it easier. The effects it had on us went from typewriter to computer.
But the early computers were not very user friendly. In my office,
we didn’t have that much of a problem, the mainframe computer
system was assigned to the facilities office. The priority was test
reports. Everything else was secondary. That meant my office was secondary,
except for payroll.
Johnson:
You mentioned that all the astronauts had come through at various
times to watch some of the testing. What were your feelings during
the Apollo Program, watching them fly, the different astronauts? The
ones that always come to mind are Apollo 8 or Apollo 11. Maybe you
can describe some of those experiences and where you were and what
you were doing.
Haynes:
I would say we were probably as tense as the group in JSC and Kennedy
or maybe more so because we knew the anomalies from the testing we
had done and what we hadn’t done. When Apollo 11 touched down
on the moon, a great sense of pride for having been a member of the
NASA team.
Johnson:
Where were you when Apollo 11 landed? Were you at work?
Haynes:
I must have been at work. I do remember that it was quite exciting
and a very proud moment.
Johnson:
You were attentive.
Haynes:
I was attentive.
Johnson:
While you were at White Sands, during your tenure there you worked
under several different managers. Is there anything about their management
styles or anything you would like to share as far as the way it was
run or any of their styles, like I said, their management styles?
Haynes:
I alluded to you earlier that NASA was a technical organization, but
our managers didn’t necessarily possess a management background.
They had a technical background, which was consistent with the policy
of NASA. But generally, I don’t think we found managers any
different from what you might find in a similar type technical organization.
I think we covered the spectrum. We had from very good managers to
poor. A good manager manages people. If you have a manager who manages
the work, that is what a technician should do. When you get a manager
who manages work, I put him on the bottom of the scale. We had one
of those and we had the other.
Johnson:
Across the board?
Haynes:
Yes, But I think the key is that we got the job done. We were successful
and that is the important thing.
Johnson:
I noticed also in your list of duties, one of the things that was
under there was communication. What did that entail?
Haynes:
Providing for all the land lines, telephones, fax machines and installations
to meet the requirements of all site personnel. We got help from the
telephone company, who wrote up a plan and made suggestions of what
would be the best for the site. The biggest effort was monitoring
the requirements and keeping up with the changes to the system.
Johnson:
You left NASA in 1981.
Haynes:
Yes.
Johnson:
What lead to that decision?
Haynes:
The enthusiasm was over. We began to get into Skylab at that point,
which was not quite as glamorous. We were to a point where we had
written so many regulations that it was more difficult to get the
job done. I just felt that it was time to give somebody else a shot,
and I really intended to retire, but it turned out I didn’t.
The experience I got after that was quite interesting too.
Johnson:
What did you do when you left NASA?
Haynes:
I worked at New Mexico State University [NMSU] for five years as their
contracts manager, consulted for Dynaelectron Corporation for about
a year. Then I went to work for Cortez III Corporation and worked
there for five years. After that, I finally retired.
Johnson:
If you will, looking at the time you were there from 1963 to 1981,
if you can give us just an overview, in your mind, of the changes
at White Sands Test Facility and how it changed overtime as far as
in the Las Cruces area also.
Haynes:
You can’t imagine how Las Cruces has changed. The area was desert
all the way out from Las Cruces to WSTF. There was one abandoned service
station and on out a little ways, there was an old warehouse. Now
there are houses and businesses from Las Cruces to the NASA turnoff
from U.S. Route 70, with a four lane highway which replaced a two
lane road. The WSTF site continued to be kept operational, as well
as added capabilities in both engine testing and laboratory functions.
The Air Force built a Tracking Data Relay Satellite System [TRSS]
adjacent to the 100 area of WSTF.
Johnson:
You mentioned your most significant accomplishment, in you mind, was
never having caused a schedule delay. What about the most challenging
part of your job?
Haynes:
I would say the most challenging was meeting the tight schedule requirements
and supporting the other offices to meet their requirements. One example
comes to mind, the logistics of getting delivery of propellants and
gases to meet the test.
Johnson:
Well, if it is okay with you, at this time I’m going to ask
Jennifer and Rebecca if they have any questions. Jennifer?
Ross-Nazzal:
I have a couple of questions. Did White Sands Test Facility ever do
any work with New Mexico State University?
Haynes:
Yes, we did.
Ross-Nazzal:
Could you talk to us a little bit about that relationship and the
different programs or type of work that you may have done, generally?
Haynes:
When we came to town, the medical facilities were not adequate. Nor
were the personnel familiar with how to treat personnel who had been
exposed to oxidizer or propellant fuels. The hospital had no method
to calibrate their equipment. We did some equipment calibration and
set standards for equipment with the medical community as well as
the Physical Science Laboratory at NMSU.
Ross-Nazzal:
I just have one general question. Could you define what procurement
is specifically, and then compare and contrast it with things like
budget work or contract work? If somebody were to ask you about that,
if they wanted to write a paper on procurement, what would you tell
them?
Haynes:
The process of obtaining materials and supplies and service support
which includes warehousing, surplus disposal and construction contracts.
Ross-Nazzal:
And how does that differ from doing budget work or contract work?
They seem to me to be almost part of that process. They also seem
to be different in a sense.
Haynes:
Oh, I would say quite different. The budget process is developing,
planning and tracking costs. Payroll is part of the budget process
whereas contracting is very different as defined above.
Ross-Nazzal:
Since we are interviewing someone who did all of these things, and
we are going to be interviewing other people from these areas, I thought
it would be a good idea for us to get a good grasp of what these different
areas entailed.
Haynes:
Did I explain it enough for you?
Ross-Nazzal:
I think so, yes.
Haynes:
Okay.
Ross-Nazzal:
That’s all the questions I have.
Wright:
I have a couple, and they’re not related. I want to go back,
and you originally were talking about the first couple of years that
you were here and when you arrived you had pretty much a budget that
wasn’t—or maybe was—an unlimited budget. You had
money that you could spend. You didn’t have auditing. Can you
give us the background on this? Where did that come from, and did
you know that when you walked in the door, that the first two years
it was kind of open at that?
Haynes:
The President gave us this task of sending a man to the Moon and returning
him, in this decade. The budget was developed by NASA and submitted
to Congress. We didn’t have any cost time, so it was just a
matter of best guess and past experience. I found out later that even
though we seemed to have plenty of budget, we still had our budget
reviews with JSC. Initially they were on a monthly basis. We were
required to submit our budgets to JSC for approval.
Wright:
My last question is, you talked about different relationships between
the military agencies and between the contractors, but when you and
others moved into Las Cruces, how did the community receive you, and
how did that change over the years?
Haynes:
The biggest problem that my office had was dealing with local vendors.
They were used to supplying common items they had in stock and if
there was a requirement for something not in stock, it would take
two to six weeks to get it. NASA’s policy was to contract first
in the state of New Mexico and the city of Las Cruces.
Wright:
How the community received you and the people and how that changed
over the years.
Haynes:
When we first arrived in Las Cruces, it was a sleepy, little town.
It was the land of manana. It is still somewhat the land of manana.
When I first arrived, Mr. Hugh Milton, former Under Secretary of Defense,
personally met me and drove me around town to look for a house to
rent or buy. This is representative of how the community of Las Cruces
thought of NASA folks. When my supervisor told me who he was, I couldn’t
believe it. Another example, invitations were sent to all the realtors
in Las Cruces to come to WSTF and work with NASA on helping with housing
for NASA and the contractor’s employees. Only one realtor responded
and came to WSTF to determine NASA requirements. For example, if we
had North American coming to Las Cruces, that was all you had to tell
him. He made up packets and sent them to incoming personnel. Told
them he would meet them at the airport, inform them what housing was
available, price range, etc. He provided similar services when they
were leaving. He provided excellent support to personnel coming in
or moving out.
Johnson:
I thought of something while you were talking with Jennifer about
the accidents and that sort of thing. Was there any type of training
for safety available, and did that come out of your office?
Haynes:
No, not from my office. We had a Safety Office and the Safety Officer
worked on the staff of the manager. He had an ongoing safety training
program for WSTF personnel. His safety training was very effective.
There was only one major accident and no deaths in the course of the
total test program at WSTF, while I was there.
Johnson:
Is there anything in closing that you’d like to say or anything
we didn’t cover?
Haynes:
Yes, I would like to say that I was always proud to be part of NASA
and the work they did and the way they did it. I was glad to be a
member of the team.
Johnson:
We want to thank you for being here with us this afternoon.
Haynes:
You are very welcome.
[End
of Interview]