Robert
F. Thompson
Interviewed by Kevin M. Rusnak
Houston,
Texas –
11 September 2000
Rusnak: Today is September 11, 2000. This interview with Bob Thompson
is being conducted in the offices of the SIGNAL Corporation in Houston,
Texas, for the Johnson Space Center Oral History Project. The interviewer
is Kevin Rusnak, assisted by Sandra Johnson.
I’d like to thank you for coming back again to visit with us.
Thompson:
Kevin, you’re welcome. I look forward to reminiscing a little
bit more here today.
Rusnak:
I look forward to hearing what you have to say. Before we started
rolling, we were finishing up on landing and recovery, and I guess
we’re going to make the transition to Apollo Applications. But
in between that time, you had a brief stint at NASA Headquarters,
is that correct?
Thompson:
Well, yes, I guess you can—you bring up a part of my history
I tend to forget a little bit. Yes, toward the tag end of my time
at recovery, I was approached by George [E.] Mueller about coming
to Washington [DC] and being set up in Washington in Operations Office
as one of three mission directors he was talking about putting up
there.
It would, of course, have been a promotion. It would have been a change
of career path and so forth. On the other hand, I was not personally
that convinced that we needed that kind of an office in Washington
or that kind of a function, so I expressed kind of some doubts to
George and told him that I would be willing come up there for a period
of time, forty-five to sixty days, to look at what he was proposing
to do, and if I thought that clearly was something I would want to
do, then I would stay. Otherwise, I would come back to the Johnson
Space Center [Houston, TX].
So I went to Washington, transferred to Washington, stayed about forty-five
days, I guess. I still wasn’t completely convinced for the need
to have that kind of a function operated out of Washington, knowing
how the missions were run and knowing how the operation of control
center went. It looked to me like more of a superficial staffing function
rather than something that had to be an in-line mission director function.
So I wrote George a letter and told him I preferred to stay at the
Johnson Space Center. He was very gracious about it, and that was
the end of my career in Washington.
They subsequently set up the office, set up some mission directors,
and used that activity for a fairly short period of time, a few missions.
Then events overcame that, and that was dropped as a function and
not picked up again later on. So it was tried and, I guess, did some
good things and some things that maybe weren’t so good, but,
in any event, it was not something that stayed in a permanent part
of the program.
Rusnak:
You talked about going back to Houston. One of the things we didn’t
mention before was moving the Space Task Group from Langley [Research
Center, Hampton, Virginia] to Houston. I was wondering what you thought
of that move, as someone who had grown up in Virginia and had most
of your life to that point there.
Thompson:
Well, I was like a lot of the people that were in that situation at
that time. We were all in our mid-thirties, had young children, spent
a lot of time at Langley Research Center. Our entire careers had been
there up to then. So you naturally are not anxious to move, but I
think I understood once I joined the Space Task Group that the possibility
of a move was there. So when the move came about, you know, I accepted
it as just part of the job and moved the family here. We were very
pleased, after it was all over with, with the move. But it’s
probably not something you would seek out. It’s just something
that you get caught up in the flow of events. It certainly made sense
to me that, particularly with the lunar landing function now assigned
to the Space Task Group, that we could not longer live as a first
cousin at the Langley Research Center. We had to move off and take
on an identity of our own.
Not that we didn’t have an identity of our own there. The Langley
Research Center was very supportive of the Space Task Group, but facilities,
people, it’s hard to mix those two functions, and for the Space
Task Group to grow and take on the responsibilities that they had,
it had to move and go somewhere else. Of the places that were discussed
to move, it boiled down mainly to a kind of debate to going to Florida
or coming to Texas. I guess the politicians at the time were stronger
from the Texas vantage point, so here we are in Texas forty years
later, I guess.
Rusnak:
At the Johnson Space Center.
Thompson:
At the Johnson Space Center.
Rusnak:
Gives you some indication, I guess, of the politics.
Thompson:
Of the politics of the time. That’s correct.
Rusnak:
Some of the other functions going on here weren’t just the lunar
landing, but they came up with this idea of Apollo Applications [Program,
AAP], which you became involved with. Tell me how you made the move
here from Headquarters, I guess, into AAP.
Thompson:
Well, I actually came from Headquarters back to the landing and recovery
job and then moved from the landing and recovery job to the AAP job
in 1966. I don’t recall the exact date of when I went up to
Washington for the forty-five days. It must have been in ’64,
’65, somewhere in that time period. In any event, to answer
that question, I think I have to give you a little feel of the way
bureaucracies work and their gyrations within the federal government.
Annually an agency is required to give a five-year budget projection,
at least they were at that time. So when you take the time in 1966,
the agency was being asked what money it needs for the next five years.
So that would take you from ’66 to ’71, for example. Well,
the lunar landing was schedule for ’69. So to project the agency’s
budget needs, particularly the manned space flight out beyond ’69,
you had to have some justification for what you were doing. The funding
had already been identified to carry out the basic Apollo Program.
So, like any good agency, you then come up with some new thoughts
on what you’d like to do that would extend your lifetime beyond
lunar landing.
None of us were particularly interested in landing on the Moon and
then going off and looking for another career. We thought there was
a future for manned space flight. So the natural thing then was to
think about taking some of the Apollo-designed hardware and using
it for other applications, hence the name Apollo Applications.
Then I need to also explain a little bit how an agency works in the
very early conceptual phase of identifying some new work. The burden
for making these five-year budget projections predominately falls
on Headquarters. So the people running manned space flight have to
project out what money they need for the next five years and make
that part of the overall NASA budget. In an office like Manned Space
Flight, they had a small group of people thinking about the future.
At a center like Johnson or Marshall [Space Flight Center, Huntsville,
Alabama] or Kennedy [Space Center, Cape Canaveral, Florida], usually
somewhere within the organization there’s a small group of people
charged with thinking about the future, future activities. At the
Johnson Space Center, we always had that small group in our Engineering
Directorate. It was always called Advanced Planning. Those were the
people trying to guess where you might want to go.
So along about 1965, ’66, the Office of Manned Space Flight,
and George Mueller was the Associate Administrator for Manned Space
Flight at time, he had to put into his five-year budget projection
some money for new activities over and beyond Apollo, so he began
to put in an Apollo Applications budget. Then these small groups at
these different places, advanced planning people, would try to figure
out what to do that made up that program. You had command modules
out of the Apollo Program. You had lunar modules out of the Apollo
Program. You had Saturn V vehicles. You had Saturn IC vehicles. So
Apollo Applications, in those people’s minds, were just a group
of individual flights using that hardware to do various things.
Also, by 1966 George Mueller was beginning to lean on the Center to
set up Apollo Application Program Office, because you get that money
in the budget and the people who oversee your budget begin to ask
details of exactly what you’re going to do, that becomes to
be a lot of activity in that area, and people want a point of contact
at the Johnson Space Center to work everything called Apollo Applications
or everything called new program kind of things that have progressed
to that point.
So in 1966, George Mueller was asking Bob [Robert R.] Gilruth to set
up an Apollo Applications Program Office at the Johnson Space Center.
Bob realized it was time to do that because of the increased activity
of what you’re going to do with that projected budget five years
hence. So he asked me to leave Recovery and come over and set up the
Apollo Application Program Office, which I did in April of 1966, utilizing
some personnel that were formerly in the Gemini Program Office, because
Gemini was phasing down at that time.
Chuck [Charles W.] Mathews, who had headed the Gemini, had agreed
to take a job in Washington. So in April ’66, I went over and
became the Apollo Applications Program Manager at the Johnson Space
Center and began to try to sort out what the Apollo Application Program
was and what the Johnson Space Center should do to support that program.
Well, the thing, in looking back from my perspectives, and I was the
Program Manager for that program from 1966 to 1970, in that four years
it was mainly an activity of debate on what the program should be.
Originally, as conceived, as I said, it was a lot of individual flights
using Apollo hardware and Earth orbit, even some discussion of follow-on
lunar kind of things, but mainly centered on Earth orbit.
A large extent was a fishing expedition on the part of Manned Space
Flight to see what other people in the agency or in the country might
want to do using this hardware. What kind of experiments would the
Earth sciences people want to fly, or the lunar physics people want
to fly, or the human resources people, or the medical people and so
forth?
So it was a matter of trying to really collect a set of what we would
like to do instead of, "We’ve got this hardware. How can
we make it do it?” So we had a whole hodgepodge, if you would,
of different kinds of missions that were being discussed. All the
while, each six months you had to submit the budget, some dollars
and some specifics, to fulfill the national budget requirement.
So that environment naturally led to a lot of debate. Some people
wanted to do this, some people wanted to do that. Some people thought
this was a good thing to do, some people thought that was a good thing
to do. So there was a lot of meetings and discussions and pros and
cons of what really should be done.
Also at that time period, a lot of people were very busy with Apollo,
particularly at the Johnson Space Center and, to some extent, at the
Marshall Space Flight Center. So we went through, oh, two or three
or four different cycles.
One thing that was proposed, maybe in the first eighteen months of
the program, was an experiment using the third stage of the Saturn
V vehicle, the S-IVB stage. This was a propulsion stage having a large
tank for liquid hydrogen, a somewhat smaller tank for liquid oxygen,
as the third stage of Saturn V. It was the stage that you put in Earth
orbit and then restart to the send the lunar hardware toward the lunar
trajectory. Some people, particularly a lot of people at Marshall,
the German team over there, [Wernher] von Braun had always had some
thoughts of how use spent propulsion stages in Earth orbit. You expend
the energy to put these stages in orbit, you ought to use them for
something.
So someone came up with the idea of building an airlock so that the
command module could turn around and dock with this airlock. Then
you’d go through this airlock down into this empty hydrogen
tank from this leftover stage that helped put you in orbit. The original
thought was just to go down in there in an extravehicular activity
[EVA] suit and float around in this big tank, just to see what it
was like. So that got to be one of the flights in Apollo Applications.
In the meantime, we were looking at flying the Apollo Telescope Mount
[ATM], which was an experiment that was being supported on the unmanned
side of the house, but Manned Space Flight was able to entice them
to bring those experiments over and let us fly there in the empty
bay of the service module. The Apollo vehicle had an empty bay in
the service module, and the thought was to put some of these solar
telescopes in that empty bay and fly the Apollo command and service
module in Earth orbit and shine these experiments or telescopes toward
the Moon and take that data. So you had AAP doing solar physics. You
had AAP having people float around in big empty hydrogen tanks. You
had flying missions where you had a lot of cameras looking down at
the Earth in different frequency ranges.
As the program evolved, people began to say, “Well, gee, if
we’re going up there with an airlock,”—and by that
time we’d contracted with McDonnell-Douglas out of the Houston
group because we had the Gemini contract with McDonnell [Aircraft
Corp.], and the airlock was conceived to use some of the Gemini components,
particularly the door. So McDonnell-Douglas, they would have won that
contract, I think, for $10 million bid to build us an airlock.
So the program was growing kind of in that kind of a hodgepodge fashion,
and the medical people at that time were beginning to say, “Gee,
we’re going to have fourteen days’ worth of experience
of man in zero gravity or low gravity. We would be willing to go out
on the LM [lunar module] and commit a man to flying twenty-eight days.
We’d be willing to double it. It's no more scientific than that.
We can do it for fourteen days, we’ll try twenty-eight.”
The doctors were very adamant you couldn’t do twenty-nine, but
you could do twenty-eight, or you couldn’t do thirty. So we
went a twenty-eight-day mission, and then we doubled it again, go
to fifty-six days. Then they said, “Well, if you've got that,
you can go three months.” So we went twenty-eight, fifty-six,
and so on. So the medical community came in and very much supported
long-duration Earth orbital missions of twenty-eight, fifty-six, and
ninety days.
So now we've got a lot of people wanting to do solar physics, people
wanting to have manned Earth orbit for longer periods of time. We've
got this Apollo hardware with the airlock contract going. We’re
trying to put this together in a program. Lots of meetings, lots of
debates, lot of budget projections.
Meantime, the country’s going on with the Apollo Program. We
got through the Apollo fire and got the program back on track. As
we at the Johnson Space Center began to look at some of the things
that people were talking about doing, for example, not too long after
the airlock and the spent stage was approved as flight, people were
saying, “Well, look, we got an empty airlock and we’re
going to be up there that long, we've got to at least have a bathroom.
So why don’t we figure some kind of potty we can put in the
thing.”
Then, “Gee, you know, we’re going to be up there for twenty-eight
days, and we need a reasonable place for food, so why don’t
we put a kitchen and a refrigerator?” And the next thing you
know, we’ve got the building of an embryonic space station down
in this empty propellant tank. It’s sort of like when you’re
getting ready to go camping with a tent, in a pup tent, and then after
you think about it a little bit, you want a bigger tent, and then
after you think about it a little bit more, you want a mobile home,
and why not just build yourself a summer cottage out on the lake?
Well, we were going through that. It was all serious. We were trying
to put a program together.
Well, by the time we got into maybe the 1968-’69 time period,
there was a fairly serious study chaired by the Vice President, [Spiro
T.] Agnew at that time, and he was the Chairman of the Space Council.
As far as I know, we still have that Space Council and the Vice President’s
still the Chairman of the Space Council. We did a so-called post-Apollo
study, where they got together a large body of knowledgeable people
and tried to figure out where the country should go in manned space
flight after Apollo.
That study looked at four things. It looked at going out of business.
You know, you could just shut off the funding and quit flying men
in space, shut it down. You could do things in low Earth orbit, and
low Earth orbit is, say, up to 500 or 600 miles altitude above the
Earth. You could colonize the Moon, in other words, continue the lunar
program. Or you could mount a major expedition to Mars. Those were
the four options they settled out and studied.
Finally they came in with a recommendation of they didn’t want
to quit, get out of the business. So that was fine, and everyone was
happy about that. The low Earth orbital infrastructure was the only
one that they could get any real strong support for, and that was
the recommendation that the country focus on a low Earth orbital infrastructure,
that to continue to fly to and colonize the Moon was too expensive
and not that productive, and a manned expedition to Mars was super-expensive
and wasn’t that productive. So those two were set aside.
So this group recommended low Earth orbital infrastructure which gave,
again, some impetus to move back to low Earth orbit and extend the
flight time and so forth. Apollo Applications became fairly stable
at that time, around taking this airlock and this spent stage and
trying to do the twenty-eight-, fifty-six-, and ninety-day mission.
The solar telescope part of the program was still pretty solid, because
solar physicists really wanted that data, and the size of their instruments
and what they wanted to do really required a fairly big vehicle. It
wouldn't be good science to try to do it just in the bay of the service
module or do it with the unmanned vehicles that they had available
to them at that time. So they were a strong faction. The long-duration
Earth orbital thing was a strong faction.
So Apollo Applications began to be relatively serious of putting some
kind of an embryonic space station in low Earth orbit and doing solar
physics and doing the medical things, and then also fly the auxiliary
experiments that people wanted. So this idea of taking this empty
stage and making it a seaside cottage with a potty and a kitchen and
so forth, got a lot of support, and that program began to grow like
Topsy, because you had to build the refrigerator in such a way you
could store it in here and have liquid oxygen in it. Then it would
become a refrigerator. Or you had to store it outside and bring it
in and plug it into something to make a refrigerator.
So this thing became, and I use a term, we called it the “wet
workshop.” People didn’t want to call this thing a space
station, because they didn’t want to kill the thrust of going
on to a future better space station. It was called a workshop. But
as we looked more and more to the wet workshop, particularly those
of us here at the Johnson Space Center looking at it, the more and
more it looked like we were getting in over our head. You know, we
were taking what was to be a fairly inexpensive simple floating around
in a tank, and now we’re trying to build a half-way reasonable
space station out of it. It looked it was too heavy.
Also at that time the people at Headquarters wanted to use the S-IB,
S-IC, I guess it was called, the interim vehicle that was developed
in Apollo, because the funding projections and all of the conversation
between the Congress and the agency was that all the Saturn Vs that
were being funded were required for the lunar program. They’d
been justified in the lunar programs, and they were required for the
lunar programs. So the Saturn V was unavailable to AAP at that time.
So we were trying to do all this stuff with the S-IC. Well, this workshop,
this wet workshop, became a Tower of Babel, in my judgement, and it
just overwhelmed the S-IC, plus it also overwhelmed, in my opinion,
good judgment of what you ought to—if you’re going to
spend this much money to go camping for two weeks, you ought to take
a reasonable camp site along with you and not a tent and a whole bunch
of pegs and spend your whole two weeks there trying to put a camp
together.
So we at the Johnson Space Center began to become hard to live with,
because we kept arguing with the people in Washington and the people
at Marshall, who really supported the wet workshop. They believed
in it quite a bit more than we did, and they wanted it more than we
did. They weren’t able to see all the warts, kind of like trying
to convince a mother her baby’s ugly. You should never try to
do that, you know. The warts on a baby never look bad to the mother.
So we had the problem of trying to go up and tell them that they had
an ugly child, and we really didn’t want to do that. If we wanted
to use the S-IC, we argued, you should take the SLA [spacecraft lunar
module adapter, pronounced “slaw”] area on the S-IC and
fit it out on the ground and, like a trailer, and go into orbit with
that. Or you take a Saturn V and fit out the third stage before you
launch it dry. So you can either go to the dry workshop on a Saturn
V, or go to the SLA lab on the S-IC, but third in that choice was
a wet workshop, and we shouldn’t do it.
Well, that was a relatively unpopular position, because the people
at Manned Space Flight had made commitments to OMB [Office of Management
and Budget] and made budget projections. You know, people who say,
“This is a good thing to do,” don’t like to go back
and tell the people six months later that it didn’t turn out
to be a good thing, and they wanted to do something different.
The Air Force at that time also was using the Gemini vehicle in a
program called MOL [Manned Orbiting Laboratory], where they were doing
something quite a bit like the S-IC SLA Workshop that we were proposing.
The people in Washington were worried that if we got these programs
looking too much alike, the Congress would ask the obvious question,
“Look, the Air Force is doing that, and that’s a lot like
what you’re doing. Why don’t we just take the money out
of your budget and let the Air Force do it?” That’s just
a logical question.
So we spent, I don’t know, quite a number of months arguing
back and forth over whether or not the wet workshop is something the
country should do, and we were very much against it. A lot of the
people at Headquarters were very much for it. The people at Marshall
were basically for it. So we kind of had a Mexican standoff for quite
a bit. Fortunately, people were mature enough to handle that kind
of pro and con, back and forth argument to where no one got seriously
hurt in the debates. Toward the, I don’t remember, late ’68
maybe, George Mueller called a meeting one day down at the Cape and
announced at the meeting that he had finally found a way to free up
some Saturn Vs and that we would go to the dry workshop. That made
everyone very happy.
We proposed, we at the Johnson Space Center, proposed that we shift
the airlock contract to Marshall so that they could combine that airlock
with the S-IVB stage and make a very good program out of it. McDonnell-Douglas,
in response to that, moved the airlock project to Huntington Beach
[California] and their organization and put it all under one group
out there. I think from that time on, once we went to the Saturn V
launch dry workshop, Skylab got to be a very productive program.
I actually stayed with Skylab until 1980—no, excuse me, 1970,
at which time I left Skylab and went to the Shuttle Program. But the
four years that I had Skylab here at the Johnson Space Center were
primarily years where we were debating what the program should be,
went through the evolution into long-duration manned, solar physics,
and some other kinds of things as the basic requirements. When we
got over the hurdle of using the S-V, Saturn V, for the basic launch,
use the S-IC to put the command and the service modules into orbit
to fly with it, it got to be a good program once that occurred and,
I thought, ended up being a very productive program.
Rusnak: How did the centers go about defining the areas of responsibility
for this? Because previously in Apollo and earlier programs, there
had been very sharply defined interfaces. You know, the spacecraft
goes to the Manned Spacecraft Center, and then you can draw a line,
and the booster’s Marshall’s, where here this spacecraft
is part of the booster, with the workshop being in—
Thompson:
Well, that was part of the growing pains of Skylab. What I call the
growing pains of Skylab were a combination of not knowing exactly
what you wanted to do, not knowing exactly then if you could decide
what to do, who was going to do what with what, which, and to whom,
because it was bringing Marshall into spacecraft kind of things, which
was new and different for them. So you had those kind of issues in
the back of your mind while you’re trying to debate whether
you should have a wet workshop launched on an S-IC or a dry workshop
launched on a Saturn V, or a SLA lab in the workshop launched on an
S-IC.
So you had a big mixture of issues that kept boiling for maybe eighteen
months to two years. You had different personalities. You had the
people in Washington who were under the gun to interface with the
Office of Management and Budget and the White House staff that was
overlooking them and they would go over there and say, “Flying
this S-IC wet workshop is the greatest things since sliced bread.”
Then they’d come back and we’d come into a meeting and
say, “That’s the dumbest thing we’ve ever heard
of.” I mean, these people were in a hot spot there.
Then they would go down to Marshall, and Marshall would say, “Sure,
we can make the wet workshop work.” They’d come to Houston,
and we’d say, “No, the wet workshop isn’t a good
thing to do. It’s too heavy. It’s too much EVA. It’s
too expensive. It’s too this, it’s too that. If it’s
a dumb thing to do. If we’re going to spend that kind of money,
we should do this.”
That puts people into kind of an interesting high-frequency mode.
My experience of the first four years in Skylab was mainly in that
kind of environment. Fortunately, we got through it. I think the Skylab
Program, as it finally evolved, where the solar physics, the Apollo
Telescope Mount was put on, the Saturn V now could launch the wet
workshop, the long-duration things and the solar physics things in
a much better environment and put the country into where it could
do those three missions in a very effective manner.
Skylab was deliberately conceived as not a long-duration space station.
There were never any provisions the way Skylab finally evolved on
the dry workshop. There were never any plans to resupply the propellants,
to carry it beyond the three missions that were planned. The way Skylab
was left on orbit and then decayed and burned up was exactly the plan.
Late in Shuttle, all the conversation that came out in this discussion
in the newspapers of taking the Shuttle up and extending the lifetime
of Skylab was pure unadulterated rhetoric. No one ever seriously considered
that, not that there was any way to do it. Skylab wasn’t configured
in a way—it was a one-shot adventure, and that’s the way
it had to be.
The modifications that we ultimately had to do to the command and
service module to support Skylab were relatively modest, and we did
not use any of the lunar module hardware or the LM or its hardware,
although there were a lot of debates that used the LM hardware early
in the program. But as it finally evolved, I think Skylab was a very
productive use of residual hardware out of the Apollo Program, and
the spending that brought new hardware in, like the Apollo Telescope
Mount and the bathrooms and the kitchen and the sleeping rooms and
the exercise equipment for Skylab, was all money well spent.
It also then freed the country up to come back to the post-Apollo
studies which says "Let’s build a long-duration space station
in Earth orbit and a build a logistics vehicle that can fly people
and equipment and hardware to and from the space station." That
got us back on the path to the Space Shuttle, which was the first
part of that long-duration manned Earth orbital thing, and we’re
on that second study path to this day.
One of the things that has been somewhat of a disappointment to me
is that I don’t think we have articulated that second study
path as effectively as we should have in this country. I think we
haven’t laid out as effectively as we could what you might do
over a twenty- or thirty-year period in low Earth orbit using things
like the Shuttle, things like Space Station, things like solar power
generation, those kinds of things. We tend to—and I know a lot
of my colleagues will disagree with me—we tend to get off on
this kick of, you know, a hero astronaut to Mars, and that’s
maybe a good thing to do at some point well in the future, but when
you focus on that, you deter people thinking about the low Earth orbital
infrastructure, and I think you put a lot of confusion in where we
should be going over the next ten years.
It’s one thing to be a visionary and throw out lunar landing
and flying through the cosmos, you know, with the wave of a hand.
It’s something else to figure out what you’re going to
do in the next five years or ten years or fifteen years or twenty
years. And the country can only afford so many visionaries running
around and saying what’s going to happen in the next 2,000 years.
That’s only so effective because you have to live in the next
five years. You have to figure out a funding profile for the next
five years. You have to convince people that you’d like to do
something in the next five years. These programs now are such, it
takes ten years from the time you start talking about a space shuttle
till you’ve gotten one. It takes ten to fifteen years’
time to start talking about a space station until you’ve got
one.
I’m not a person that wants to run out every day and say we
ought to go to Mars tomorrow. I don’t think that’s necessarily
very productive. We went through enough debate the first three years
of trying to understand just taking some Apollo hardware and applying
it to what became known as Skylab. I think it ultimately came out
very effective, but there were lots of long meetings and lots of heated
debates and lots of activities that had to take place before we emerge
in something that was practical there.
The four years I spent in Apollo Applications or Skylab did give me
a good understanding of how to work with other centers, how to work
with Headquarters, how to deal with issues where people don’t
all agree. How do you get a consensus out of people disagreeing? That
was a good stepping stone to get into Shuttle because at the time
I joined the Shuttle, they were an awful lot of loose ends still on
the Shuttle at that time. So there was a lot of debate, a lot of loose
ends, a lot of management issues that had to be sorted out the first
couple of years of Shuttle, and they weren’t that dissimilar
from the same sort of things we had gone through on Skylab. So that’s
kind of summary on Skylab.
I think Kenny [Kenneth S.] Kleinknecht moved in as the Program Manager
after I left at the Johnson Space Center. He worked really effectively,
I think, with the Marshall people. Marshall had the predominant job
of building the new hardware associated with Skylab. The modifications,
as I said, in Glenn’s service module were important, but they
weren’t that significant.
Of course, the operational aspects of Skylab brought some operational
factors from Marshall that had to be integrated with the operational
activities here at the Johnson Space Center. You had to also reach
out and bring the scientists into the picture. So it was a good program
as far as a precursor to a space station kind of an operation, where
you have to work with people from multiple centers, people from inside
the agency, as well as people from outside the agency. They will have
that in spades now on the Space Station as they work with the Russians,
they work with the scientists that are involved in the program, work
with all the different people they have to work with on the Space
Station.
Rusnak:
Since you mentioned the scientists, what direct role did they have
in this definition period? You've mentioned generally including the
Apollo Telescope Mount and these types of experiments in terms of
helping to shape the workshop and the requirements and such.
Thompson:
Let me talk about the solar physicists. As it boiled down, the solar
physics experiments ended up with five different major experiments.
In other words, there were five different groups around the country,
most of them in either academic environments or research environments
in government labs or something somewhere. Now, those people were
people just interested in getting their instruments in space, having
it take reliable data, give them the data, and then they would analyze
it and report it in their technical channels. So they were less interested
in the vehicle than they were in the science they were looking for.
So they were very willing to come forward and say what science they
would like to have. They were not very visible in trying to argue
whether it ought to be in a wet workshop or a dry workshop or this
way or that way. If you had to fit it into a compartment in the service
module that didn’t give them enough physical size to do what
they wanted, or you couldn’t handle the data rates that they
wanted, then they were very unhappy and they said, “We don’t
want to fly in that environment, but we’d like to fly over here
where we can get the length we want for our gathering instrumentation,
the stability we want for our pointing, the ability to record or transmit
data at certain rates.” So they had an influence on what you
did, but they didn’t weren’t in the meetings where you
argued. They generally stated their requirements. Then you took those
requirements and tried to meld them into some approach on how to go
about doing it. If you stiff-armed them too much, they would say,
“We just don’t want to fly with you. We’ll go somewhere
else. We’ll take our money and our experimenting and go do it
some other way.”
Rusnak:
What about their influence on Congress, for instance, in whether or
not they see something like a Skylab as a useful scientific platform?
Thompson:
Well, of course, they’re a very valuable aid to you when you’re
in a hearing in the Congress and you say you want to build a dry workshop
that has an Apollo Telescope Mount that is this big physically and
it does this kind of pointing accuracy, and then they stand up behind
you and say, “That’s a great thing. We’d love to
have that. It give us exactly what you want.” Then the congressman
overseeing your program says, “Hey, the scientists like it,
the engineers like it, the politicians like it.” You've got
a program.
But you’re trying to fit them into something they’re unhappy
with and you go up and try to say, “We don’t care what
they say. We’re only going to give them so much data. We can
only give them so much stability of pointing, so much physical length,”
and they say, “That’s not enough," then you don’t
have a program. You think you have a program, but you don’t
have a program. Or you might hope you have a program, but until you
can get enough of a consensus, you really don’t. Skylab was
going through that kind of iteration.
Rusnak:
What interaction did you have at this sort of upper-level policy and
budgetary discussion?
Thompson:
Well, at the level I worked the program, generally speaking, not that
much. My interface was principally with Bob Gilruth at the Center
and with George Mueller in his office in Washington. Then it was up
to George Mueller and his office, the AA for Manned Space Flight,
to interface with the Congress and interface at the senior level with
the scientists and so forth. So what I saw personally were mainly
internal meetings within the Office of Manned Space Flight debating
whether to do the wet workshop, a dry workshop, a SLA lab or nothing
and what the merits of this approach versus that approach was in the
way of cost or probability of success and things of that nature.
Our influence on the program was mainly causing the engineering design
to evolve in such a direction that we ended up on the dry workshop.
We were very happy once we went to the dry workshop. We would have
been happy with either, if we could get a Saturn V with a dry workshop
or if we had to stay with the S-IC and go to a ground-outfitted SLA
lab. We did not think the wet workshop on the S-IC was a very—it
was our judgment that it’d be a high-risk program from the weight
standpoint, from the long, complex, on-orbital build-out and assembly
that began to detract significantly from the medical work we wanted
to do and from the habitability things you wanted to do, because if
you go camping and you spend the whole time camping setting up your
camp, you haven’t had a very good camping. That was part of
our argument. So we spent a good deal of our time trying to have constructive
dialogue with George Mueller in his office and with Marshall, predominantly,
and evolving into what was finally flown as the program.
I’ve always been curious about how other people felt about the
program. I’m sure if you talked to some other people, they’d
give you a very different perspective of how Skylab emerged than I
would, because I saw it from my vantage point, they saw it from their
vantage point. That’s part of what you historians have to sort
out.
Rusnak:
That’s right.
Thompson:
And I’m giving you the perspective as I saw it from the vantage
point of trying to represent the interest of the taxpayers, the interest
of people involved in manned space flight as to what would be a good
thing to do with your money and your abilities and capabilities over
a period of time. As I said, I’m very happy with the way it
finally worked out.
Rusnak:
What level of support did you get for these efforts from Bob Gilruth?
Thompson:
Quite a bit. Bob was a very straightforward kind of a guy to deal
with. Bob was an extremely wise person on how to interface. You know,
it’s not an easy job to go up and tell your boss that what he
wants you to do doesn’t make sense. It’s not easy for
me to go tell Bob that what his boss wants to do doesn’t make
sense. So you can’t just in and frivolously say, “That
doesn’t make any sense.” You got to go in and say, “Here’s
what they want to do, and it would probably work, but here’s
an alternate you could do that might be a whole lot better.”
So you have to then work in such a way that people may not like what
you’re saying. Most people like to hear what they want to hear.
People don’t like to hear what they don’t want to hear.
But if you tell people what they don’t to hear with logic and
reason, most engineers deal with the physical laws. You know, weight
is weight. Weight projections have a certain statistical value and
experience value to them. A judgment that says we shouldn’t
spend our time doing this, we should spend our time doing that, reasonable
people will generally iterate to a common understanding.
But while you’re doing that, you’ve got to do it in such
a way that you don’t either get fired or put your boss in such
a position that he gets fired or put your boss’ boss in such
a position that he gets in trouble with the Congress. So it’s
a ticklish situation, but we all face that when we’re trying
to evolve into how you should spend several billion dollars of the
taxpayers’ money. Unfortunately, when you look back at a program,
it looks pretty simple, but until you have grown into trying to decide
what to do and how to do it, it doesn’t always just come into
focus immediately.
Bob Gilruth was very good in that environment. Bob could work with
the people in Washington in a way where he could tell them that in
his judgment what they were trying to do needed to be changed a little
bit. He wouldn’t say, “You’re wrong.” He’d
say, “You know, you ought to change that a little bit,”
and he would do it in such a way that you could all survive. I call
that wisdom. It’s wisdom coupled with a lot of intelligence,
a lot of experience.
Rusnak:
Yes, several of the other people we’ve talked to about him have
expressed a similar affection for that ability of his to present these
types of problems in a way that’s very approachable, to see
the logic behind what’s going wrong and what needs to be fixed.
Thompson:
Right. He also was a person who would allow you to do a lot of your
work. He didn’t try to do all your work for you. He would let
you come in with all of this stuff. He’d listen to whatever
you brought in. If you could convince him that there was a good logic
to what you had to say, he would take that and go forward with it,
or he would take that and give it some adjustment, whatever was needed
before you’d go forward. He could handle himself in meetings
with George Mueller and other people, Wernher and [H. Kurt] Debus
and the other people that he had to interface with.
Apollo was a relatively straightforward program from the standpoint
of interfaces between the centers, as you’ve already pointed
out. AAP got us into a much involved set of interfaces, and then Shuttle
got into much more significant set of interfaces. Bob was very good
in that kind of an environment, but he’d worked in government
bureaucracy all of his working life, in essence. You know, there’s
nothing better than a good bureaucracy. People criticize bureaucracies.
You can’t do big programs without bureaucracies. We need to
spend maybe a lot of time thinking how good good bureaucracies are
compared to how bad bad bureaucracies are. But when you can have a
good bureaucracy that everyone’s pushing in one direction and
working effectively, you can get a lot of things done. You can’t
get some big programs without an effective bureaucracy. It’s
just that simple.
Rusnak:
How much support and interest did you get from the rest of the Manned
Spacecraft Center and within NASA?
Thompson:
Well, one of the challenges any program manager has is how to use
the institutional capability that is there supporting him. You know,
a program manager is nothing more than just a quarterback or a coach
or something that has to ultimately decide what play to run or what
to do, but he can’t do it without all of the information coming
up to him. So you have to work in an environment where people are
willing to tell you what they think. Then you have to be willing to
listen to all the people telling you what to think and be able to
evaluate the things that you want to keep and the things you maybe
don’t want to keep and make some judgment calls and go forward
with them. So you use the institution very much every day from day
one, because that’s where the knowledge, the broad spectrum
of knowledge can filtered down and brought to you from which you get
your job done. Plus, it’s also the way in which the job gets
implemented, because you go back down through that institution to
get the job implemented.
So a center like the Manned Space Flight Center, if you’re running
a program like Skylab, or if you’re running a program like Shuttle,
the institution is key to you. That brings you information, and that
implements what you’re trying to get done. So it has to work
up and down very effectively.
Rusnak:
During this early period, a lot of the institutional capability is
being directed elsewhere, towards Apollo. What effect did what was
going on in Apollo, both the failures, like the Apollo 1 fire, and
the successes, like the lunar landing, have on what was going on in
Apollo Applications?
Thompson:
Well, again, what you have to do is you’re in Apollo Applications,
you have to be sensitive to the priorities. You have to recognize,
number one, that the number-one priority is the Apollo Program. You
know, ninety percent of the Center is working full-time on the Apollo
Program. If you find the fringes of capability and you find the ten
percent you need to get your job done, so the structures people are
working on Apollo problems while you’re also asking them to
do some things for you on Apollo Applications. So you’re willing
to take second priority and be sensitive to their needs on Apollo.
You can’t just go over there and demand your work at everyone
else’s expense.
So the Center was very heavily engaged in Apollo at the time we were
trying to settle on what Apollo Application was. But the Center, you
know, had 5,000 people. Not only that, but you had then access to
contractors. We had a number of contracts. So there was plenty of
manpower to work the Skylab issues at the same time we were working
Apollo.
You know, if you needed some input from the Flight Operations Directorate,
they had an individual over there on the staff who had the Apollo
Applications or Skylab responsibility. That was his full-time job.
He got paid a hundred percent of his time for that. So he came to
your meetings and you asked him to do something, he’d go back
into that group and get it done and come back. So you’re able
to run multiple programs out of the institution very effectively,
if the people will be sensitive to each other’s needs. I never
felt that we were short of either human resources or other kinds of
resources to do what needed to be done at that time.
Rusnak:
Since you mentioned the contractors, what role did they have in this
whole process?
Thompson:
Well, the contractors typically operate with the government, and the
way that at least I’m used to them operating most of the time
I was at NASA, NASA always acted as its own prime contractor, prime
meaning overall contractor. We never really asked a contractor to
come in and tell us what to do, like Apollo Applications. There was
no way a contractor could have worked Apollo Applications and had
it converge onto the dry workshop the way that it did. They couldn’t
interface with the scientists. They couldn’t interface with
the Congress. They couldn’t interface with the people at NASA
who wanted to use empty tanks versus the people at NASA who didn’t
want to use empty tanks. A contractor can’t do that job.
Now, a contractor can, if you’ll give him a set of “desirements”
or requirements, saying, “If I wanted to put a dry workshop
in that S-IVB tank that had these kind of capabilities, it had a bathroom,
it had a kitchen, it had a sleeping compartment, it had a place for
exercises, it had a place to throw our trash, could you design it
for me?” Yes, he could sit down and he could make you some drawings.
He can show you where to put your electrical system, where to put
your potty, and where to put your kitchen, where to put this. You
can interface with him and he can conceive that design for you, and
you look at that design. He can tell you roughly how much it’s
going to weigh because he’ll have a weights team that’ll
go through and tell you how much it weighs, or he’ll have an
electrical team that can tell you how to put the solar panels on and
run the wires through it and so forth. So you can get that kind of
information from him. So you can say, “Gee, it’s going
to weigh about this much and look about like this if we want to make
it dry. It’s going to weigh this much and look about like this
if we’re going to make it wet.”
For example, all the while we were debating these kinds of things,
we had some contracts for people like McDonnell-Douglas who was building
the airlock, McDonnell-Douglas who was building the S-IVB stage in
Huntington Beach. You would just put a little rider on their contract
to give you information ASAP [as soon as possible]. So you take them
questions of what would a—for example, we put a floor in the
S-IVB stage, even when it was wet, we put a floor in there to be a
floor for the workshop once we used the tank, but it had to allow
the propellant to flow through. So they designed that floor and that’s
the same floor we kept when we went to the dry workshop. So you use
your team of contractors.
NASA’s strength wasn’t in detailed design of hardware.
NASA’s strength at that time was in deciding ultimately what
you wanted to do and trying to make some judgment to call on whether
you want to do it this way or that way or some other way. Probably
even in today’s world, too much is made of the "prime contractor."
To say that Boeing is a prime contractor on Shuttle today is a little
bit of a misnomer in that NASA still has to sit on top of that program
and decide what you’re going to do, when you’re going
to do it, how you’re going to do it, how much money are you
going to spend, and so forth. Then, yes, Boeing can then take that
information and go work with the other contractors and cause something
to happen. They’re doing more of an integration at that level
than was done previously because when I was at Shuttle, the government
did that integrating among the contractors rather than have one contractor
integrate among the contractors. But we’re getting down into
semantics as to what is prime and what does prime really mean.
Rusnak:
One of the related questions in terms of groups input, what role did
the astronauts themselves have in this, these guys who are going to
be going up and flying this?
Thompson:
Well, typically the astronauts, from the time they were first brought
into the program, were always invited into and were a part of the
team involved in these discussions of what should be done or what
shouldn’t be done. So typically, for example, in Mercury, the
seven astronauts, they were given prime assignments in certain areas.
For example, Al [Alan B.] Shepard [Jr.] was given a prime assignment
in recovery. He was to monitor recovery from the Astronaut Office
point of view. John [H.] Glenn [Jr.] was given the cockpit layout,
I think, for example. I don’t remember what all the other designs
were. Now, what that meant is that if there was a significant meeting
of some sort, Al would come to the meeting, and if I wanted to talk
to Al about something, he was more than willing to participate or
go to a meeting or out in the water and evaluate something or have
another astronaut go if he was tied up.
So, starting back in Mercury, they were brought into the program so
that you could get their inputs early. As we had progressed on to
Skylab, for example, once the Apollo Application Program was set up
as a program, one of the astronauts was given the assignment to monitor
that program. That was his staff assignment in addition to his flight
assignment. So he would come to the staff meetings. He would listen
to what was going on. He’d get correspondence in the program.
He would read it, and if he wanted an input from the flight crew,
you would invite him to the meeting and say, “We’re talking
about having this kind of a potty or that kind of food or this kind
of something else or this kind of a display for the Apollo Telescope
Mount. What’s your input?”
He’d make his input, just like a structures man would or an
electrical power engineer would, and so forth, and his input of the
design was utilized like everyone else’s. So, yes, they were
very active in helping evolve the thoughts and helping evolve the
design as it progressed. They changed from time to time because if
they would get a prime flight assignment that took all of their time,
then someone else would pick up their program duties. So you had different
faces that came from time to time.
Rusnak:
As you have mentioned before, you were with the program from 1966
until 1970. What was the state of Skylab when you were getting ready
to leave the program?
Thompson:
The state of Skylab when I left the program was, sometime earlier
we had settled on the Saturn V launch dry workshop. We had moved the
airlock contract from Johnson Space Center to Marshall so that the
workshop could be all integrated and put together and designed by
one center. As I said, McDonnell-Douglas had moved that project from
St. Louis. They had acquired Douglas by that time so they moved it
to Douglas on the West Coast, or what was formerly Douglas, so the
program was pretty well firmed up, to use a term, on the path that
it ultimately was carried out starting in ’73, but it was still
three years away from flight. We had just finished the lunar landing
and we were doing some of the follow-on lunar missions.
By that time Shuttle was beginning to emerge, and the talking stage
with the advanced planning groups in Washington, Marshall, and Houston,
and Bob Gilruth called me one day and said, “Gee, looks like
Skylab’s pretty well settled down now. I’d like you to
go over here.” So I went over and started looking into what
Shuttle was all about at that time.
Rusnak:
To once again use your expertise at this sort of early stage to formulate—
Thompson:
Well, as I said earlier, for some reason, I don’t know whether
it was by plan or good luck or bad luck, I never took over a job from
anyone. The recovery thing was a start-up job, one person starting
to see what recovery boiled out to be. Apollo Applications was the
same way, and Shuttle was the same way for me. So, frankly, I think
it’s good to go and start something new like that. You don’t
have to go in and replace someone else or try to get up to speed with
what’s going on. You get the chance to go in and generally pull
together a team of people that you had confidence in, and you get
to work things essentially from day one.
On the other hand, you quite often start with sort of a can of worms
or spaghetti, and you’re trying to make something out of it.
So it takes a little while to get it all sorted out. That was true
both in Skylab and in Shuttle.
I don’t know whether anyone has talked to you about phased program
planning. Has anyone brought that term up?
Rusnak:
Only in the most general terms, so why don’t you go ahead and
describe that for us.
Thompson:
Well, as far as I know, this thought came out of some of the military
programs of how you do configuration management. But in any event,
NASA had picked up on this and by the time we got to Shuttle in particular,
we were doing what we call phased program planning. Phased program
planning has four phases: A, B, C, and D. "A" is the very
early conceptual phase where you’re just kind of throwing ideas
around in general. They aren’t firm by any stretch of the imagination.
You’re just trying to decide whether the country ought to do
something or not. At that time, lots of different wild ideas can be
thrown around because you’re not spending a lot of money, and
at that time usually you’re using your advanced planning groups,
all advanced programs in that area of responsibility. As I said, we
had a small group within the Engineering and Development Directorate
at the Johnson Space Center that was our advanced planning group.
Usually by the time you got ready to go into Phase B, which is the
preliminary design phase, by then you set up a program manager, set
up a full-time program office to worry those specifics, because you’re
now getting serious about going and doing something.
Phase A is so-called conceptual or preliminary design. Phase B is
design. Phases C and D are detailed design and implementation and
development. So by the time you get to Phase B, you’re fairly
serious, or you should be fairly serious about what you’re going
to do.
I joined Shuttle at the start of Phase B. Phase B was when we started
detailed work with the contractors. Up until that time, Shuttle had
been run out of an Advanced Planning Office at the Johnson Space Center,
out of a staff group in the Office of Manned Space Flight in Washington,
and a similar group at Marshall. They had been pretty well throwing
around the ideas of what the Space Shuttle should be.
When Gilruth asked me to come over and set up the Shuttle Program
Office and get serious about Phase B, we were—"we,"
the agency—were just getting ready to go out and contract with
contractors for what we called a Phase B study.
In view of time, maybe we want to break here and go into Shuttle,
because we won’t do it in thirty minutes, and you want to be
through at three. Or we can do thirty minutes and pick up again, whatever
you'd like to do.
Rusnak:
We can go for a little bit if we want to. Maybe we can break it up
by phase.
Thompson:
Well, let me do that, yes. Let me at least go through the introductory
part of it.
At the time, as I say, I felt that Skylab had pretty well firmed up
and stabilized. All of the debates, arguments, pros and cons were
behind us. The contracts were in place. The changes to the command
and service module were contracted for at McDonnell-Douglas, and Gilruth
said, “Look, Shuttle is beginning to get serious. I’d
like you to leave Skylab and go become the Shuttle Program Manager.
They’re getting ready to start Phase B.”
So, again, I agreed to do that and went over and set up a Shuttle
Program Office. I really stayed in the same office. I just handed
off Skylab to Kenny and his office and brought Shuttle into my office.
In fact, I stayed in the same office from 1966 till I retired. So
I just ran two programs out of the same office.
But in any event, we started Shuttle in 1970 at the start of Phase
B, or I did. At the time I got into Shuttle, the man in Washington
who was essentially the key staff manager for the Office of Manned
Space Flight—by then George Mueller had retired. He was there
during part of Phase A, and then he retired, and a fellow named Dale
[D.] Myers took over as the Associate Administrator for Manned Space
Flight. Charlie [Charles J.] Donlan, who had worked at the Langley
Research Center, he was a section head there in the same group I went
to work with in 1947. Charlie had been there since, oh, maybe, ’39
or ’40, had worked up to be the key technical engineer on the
Center Director’s staff at Langley, and then had joined the
Space Task Group after we had been under way a while. Then when we
moved to Texas, he didn’t move. He went to Washington and was
working in the Office of Manned Space Flight in Washington and was
heading up the Shuttle activity as we entered Phase B.
Marshall had a Shuttle Program Office, and a fellow named Roy Godfrey,
if I remember his name right, was the Shuttle Program Manager at Marshall.
So the concept at that time—and the people in Washington had
a big influence on this, and, I don’t know, the people in Max
Faget’s organization had been working on it—the concept
was to have a two-stage fully reusable Space Shuttle, and that’s
what we entered Phase B with.
That vehicle came out of the preliminary design kind of debates and
studies that had been going on for eighteen months maybe. That’s
the configuration that was being put out for bid when I joined the
program. The concept was to bring two contractors on board, have these
contractors work for a period of time, I don’t remember, a year
maybe, something like that, to do preliminary design on this two-stage
fully reusable vehicle.
One contract would be managed out of my office in Houston, and another
contract would be managed out of Roy Godfrey’s office at Marshall,
and each contractor would study the entire vehicle. So you had two
different contractors' study. So my job was to manage the contractor
that was selected out of this process, one of the contractors, and
Roy Godfrey was to manage another one. An RFP [Request for Proposal]
was already in the process of being written for this two-stage fully
reusable configuration.
Well, we went through that bidding process, and McDonnell-Douglas
won one of the contracts and Rockwell won one of the contracts. The
natural wisdom was to have the Rockwell contract managed by the Johnson
Space Center since we had a lot of history working with Rockwell,
and to have Marshall manage the McDonnell-Douglas contract because
they had a lot of history working with McDonnell-Douglas. So we started
out with that kind of arrangement overseen by the group in Washington,
Charlie Donlan and his staff in Washington.
So we began to look at what it would take to build a two-stage fully
reusable Shuttle. Now, when you think about it, the configuration
at that time was a pretty convenient configuration, convenient in
several aspects. One, it’s split very nicely between the flyback
booster, which Marshall would build, and the flyback orbiter which
the Johnson Space Center would build, so politically it split up much
like the Apollo Program. So, you know, that was real nice.
Two, everything was reusable, and people just were willing to equate
reusability and low cost as the right thing to have. If it’s
reusable, it’s low cost. I spent a lot of my time challenging
that, because I don’t believe that, you know. I can have something
that reusable and be a hell of a higher cost than something that’s
not reusable, both doing the same function. Otherwise, why do we have
Dixie cups? Why do we throw away Dixie cups? Why don’t we have
a glass there with a sterilization system and someone overlooking
it and locking it up in a cabinet every day, if it’s the best
and cheapest way? So just because something’s reusable doesn’t
necessarily mean that it’s the best or the cheapest or the way
in which things should be done.
But, in any event, some wisdom had come down that says it shall be
two-stage fully reusable, and that’s what was being pushed.
Well, as the studies got under way, and as here in Houston I began
to look at that configuration, I began to have quite a few doubts
on it. There were a lot of things about it that didn’t make
any sense to me. The booster, for example, the flyback booster at
that time, was extremely large and was extremely complex. It worked
out engineering-wise to have a very high staging velocity. You had
to go to about 12,000 feet per second before you even lit off the
engines on the Orbiter in order to make it reasonable on the weight
analysis of staging. It was manned. It had a whole bunch of turbojet
engines in it in additional to a large number of rocket engines, and
all it did is help get you on your way.
But it would have been a tremendously lot of fun for the Marshall
Space Center to build. They would have had their own astronauts. They
would have had their great big flyback booster, and it would have
been cheaper, so to speak. But it just didn’t look, feel, sound,
or look right. Also, to have everything reusable on the Orbiter was
making it big. The Orbiter was very large, because you had to find
room in the wings or places like that a hell of a lot of hydrogen.
Hydrogen’s very cold, very hard to handle. Had to have a lot
of LOX [liquid oxygen]. So the Orbiter was a big, complex vehicle.
But here we’re designing this two-stage fully reusable vehicle.
So I began to question the wisdom of that. So I began to look for
ways to make it—it’s one thing to be in an advanced design
group and throw wild ideas out. It’s something else if you give
them a job to go get something done. You know, you get realistic in
a hurry. So we began to think, what could we do to simplify this vehicle?
Even though the message from on high was coming down, “It shall
be fully reusable,” we said, “Well, let’s just look
at what it would take, what it would do to the Orbiter if we took
the hydrogen out of the Orbiter.”
So we had some contractors who had not won Phase B contracts, but
we had agreed, we, the government, had said, “We will use you
in some offline studies to keep you competitive, so when we get to
C, D, you can compete.” So we had Lockheed out there and we
had Grumman out there, that we were looking for something, a few bones
to throw them, to look at things, so that they could still compete
for the contracts. We didn’t want Rockwell to have a lock on
it or McDonnell-Douglas to have a lock on it, although they had a
big advantage by having won the Phase B contract.
So we called Grumman in and said, “How about looking at the
Orbiter in a kind of preliminary way, what it would look like if we
took the hydrogen out of the Orbiter and put it in the tanks that
we’ll throw away.” So they went away and studied, and
we look at it internal with our engineering capability here. Lo and
behold, the Orbiter starts getting smaller. You know, if you look
at the Orbiter today, it’s big, but if you would take all that
hydrogen and oxygen and stuff it in tanks in the Orbiter, it gets
big. Then the booster was twice as big as the Orbiter, to give you
a feel of what we were studying at that time.
At the same time, I was trying to see what it would take to simplify
the vehicle and saw taking the hydrogen out made it look good, and
I said, “Well, let’s take the LOX out, too.” I mean,
if a little bit’s good, a whole lot’s better. So we went
back and studied taking the LOX out. I say, “I,” but there
were people at the Johnson Space Center trying to do the same thing,
and they would come in and, “Why don’t you this? Why don’t
you do that?” and you’d listen to all this and then you’d
say, “Let’s go do that.”
So while we were studying this configuration that we’d given
the contractors here, we had some other contractors looking at maybe
other things we ought to do. So, lo and behold, we took the LOX out.
The Orbiter looks even better.
So, in the meantime, I’m going to Washington, and a fellow named
Jim [James C.] Fletcher is the NASA Administrator at that time. We
would go up there for our monthly meetings and we’d explain
what the program looked like it was going to cost and what the funding
curve looked like, would the two-stage be fully reusable, and the
funding curve on any of these programs, you want to start and ramp
up to some peak, and we were running, you know, we would need two
or three million dollars back in the 1971-2 dollar kind of things
to carry the program on a reasonable schedule.
Fletcher kept saying, “You guys haven’t got the word.”
He says, “We’re being told by the White House,”
and [President Richard M.] Nixon was in the White House at that time,
“that we can build anything we want to, but we’re going
to be held to one billion dollars, peak annual funding." And
he says, “I’ve told you this a dozen times.” He’d
come in here showing us these funding curves that’d go to two
billion dollars. "That’s not for real. We’re not
going to get it. I’m not going to ask for it, and get out of
here."
So after about the third time of that, we began to say, “Hey,
this guy’s serious. He’s not interested in programs that
are going to bump the agency’s funding much more than a billion
dollars out on these years because he’s been told by the OMB
and the White House that the agency budget not going to be bumped
up out there then to cover this development."
Now, personally, I wasn’t that uncomfortable with that because
I didn’t like the vehicle that was bumping it up anyway, and
I wished that there was some way to drive the vehicle down to something
that made more sense. So this fell right along the line of that. I
was pretty happy to agree with it.
So we began to say, “Well, look, maybe we don’t need a
flyback booster.” Now, that’s heresy. You know, you’re
taking a flyback booster away from Marshall, right? So you've got
to be careful how you talk about that. So we began to look at some
other ways of getting the Orbiter not only smaller, but get it in
orbit without building this great big monster flyback booster.
Well, you had to be careful about how you did that, because, as I
say, you were going right to the lifeblood of the Marshall Space Flight
Center. There were a lot of people committed to that two-stage fully
reusable, thought it was the right thing to do, it was great, the
country ought to do it.
But, anyway, we began to look at throw-away boosters. Maybe we just
ought to build a booster to take us up to some velocity and then light
the Orbiter engines and go on to orbit. So we’ll use just a
booster, not a fly-back booster. So we began to look at some liquids,
and then someone says, “Well, why don’t we just put a
big JATO [jet-assisted take off] bottle on it?” A solid propellant
on it.
So we began to look at that and, lo and behold, when you put those
kind of things on it and you lit off the Orbiter engines while it
was still on the pad—because the Orbiter engines are the most
efficient engines, their propulsion efficiency is very high compared
to other things—you begin to get tradeoffs that brought the
staging velocity down to about 3,000 feet per second rather than 12,000.
You use the Orbiter engines all the way from liftoff to the pad and
all you’d need was a great big JATO bottle, two big boosters
out here, particularly if you took all the propellant out of the water
and put it in a central tank. Then all of a sudden you’re looking
at programs that you could live within the one-billion-dollar peak
annual funding over an eight- or ten-year period.
So, lo and behold, you know, we've got a solution that solves the
funding limitation thing. You look at an Orbiter that’s not
a hell of a lot bigger than, say, a 737, and so, you know, you aren’t
shaken up by building that. So I’m throwing an aluminum tank
away, but I’m still using the engines, and not only that, but
all I've got to do is build a couple of solid rocket boosters like
they have in the Titan Program, even though they’re twice as
big, and I’ve got a program.
So, man, we’d found a solution, but it wasn’t a very popular
solution. The Marshall folks hadn’t studied it. They weren’t
interested in that. They were building a fly-back booster. Not only
that, but the booster was simple enough that you didn’t to have
to start spending money on it right away. You could go ahead and start
spending money on the Orbiter, and then you could later on spend money
on the tank. Then you could later on spend money on the booster, and
you could flatten out the spending curve, because the new technology’s
in the Orbiter. Building the simple tank and building the solid rocket
boosters wasn’t that much of a challenge, so you could time-phase
the start of the funding curve so you could flatten out the funding
curve.
Well, hell, I was happy as a bug in a rug, right? Got the solution.
Now you’re kind of back at the dry workshop/wet workshop stage,
right? How do you sell this thing? Well, the thing that sold it was
just the practicality of it. The funding, you weren’t going
to get the funding for the two or three billions dollars or whatever
you’re going to do. I say you weren’t going to. The administration
didn’t want to go and fight for it. The OMB didn’t want
to give it to you, and the White House didn’t want it. How in
the hell were you going to get it?
So, you know, you weren’t to get a two- or three-billion-dollar
peak annual funding program. The argument to build a great big fly-back
booster to go up to 12,000 feet a second and then turn around back
and land with a bunch of rocket engines and a bunch of turbojet engines,
and it’s huge—it made a 747 look small—when you
really got down to it, it just wasn’t very smart to even think
about doing that in the first place.
So the program, by the time we got to the end of Phase B, it had started
with a two-stage fully reusable, went through this evolution and came
out the end over here as an Orbiter with an external tank and some
throw-away booster rockets. I would say over the last three months
the program very quickly saw the practicality of that and went to
that. Fletcher and [George M.] Low went out to the West Coast and
had a meeting with Nixon out there, had a model of it, showed him
to it, and said, “This is what we want to spend. Here’s
the funding curve,” and so forth, and away we go.
So now it comes time to decide how you’re going to do that program.
Fortunately, we had some people in Washington who understood how programs
were run, people like Dale Myers and people like Charlie Donlan. Dale
and Charlie got their heads together and said, “Hell, we’ll
run that by setting up Bob Thompson as the Program Manager and run
all the other projects, give him the responsibility of running the
Orbiter project, the tank project, the engine project, the booster
projects, have him work out of the Johnson Space Center using the
resource in that center for his management team. We’ll go to
this so-called lead center concept with the Program Manager located
at Houston. We’ll run the program that way.”
Well, we had a meeting, or Dale had a meeting at Williamsburg [Virginia]
explaining to everyone. By that time, Wernher had left Marshall and
Eberhard [F. M.] Rees was at Marshall. The Marshall folks weren’t
that happy, but, you know, they wanted the program. They had the engine,
the tank, and the booster rockets. JSC [Johnson Space Center] had
the Orbiter. I don’t know whether he liked me being the Project
Manager or not. He didn’t really say one way or the other, because
they told him that’s the way it’s going to be, and they
sent out a directive saying that’s the way it was going to be,
so that’s the way we started Phase C/D.
We went out and had a competition for the Orbiter contract, and then
in that Orbiter contract we put an integration support function, because
we wanted the contractor to come and do some things for the government
to help integrate the program. So we had the Orbiter integration contract.
I chaired the Source Selection Board. We selected Rockwell from among
four bidders. Rockwell, McDonnell-Douglas, Grumman, and Lockheed bid.
We selected Rockwell for a number of reasons—obviously we thought
why they should have it compared to someone else—and started
that contract.
Even prior to that, we had started the engine contract out of a project
office in Marshall with Rocketdyne. Rocketdyne won that in a competition
with Pratt & Whitney. We didn’t start a tank or an SRB [solid
rocket booster] contract till sometime later. We maybe started a tank
contract out of a project office in Marshall maybe eight months later
and then started a booster program out at Marshall with the preliminary
design work done in-house at Marshall maybe a year later, to hold
the funding down while we were getting started. Ten years later, we
had a vehicle ready to go to the launch pad, or eight years later,
from ’72 to ’81, nine years later.
Rusnak:
If I could stop you there so we can change out our tape.
Thompson:
Sure.
[End
of interview]