NASA Johnson Space Center
Oral History Project
Edited Oral History Transcript
Chester
A. Vaughan
Interviewed by Summer Chick Bergen
Houston,
Texas –
12 January 1999
Bergen: Today is January 12, 1999. This oral history interview with
Chester Vaughan is being conducted for the Johnson Space Center Oral
History Project at the offices of the Signal Corporation in Houston,
Texas. The interviewer is Summer Chick Bergen, assisted by Kevin Rusnak.
Thank you for coming to talk with us again.
Vaughan:
It's my pleasure.
Bergen:
Let's start back up—we'll back up a little bit from last time
we talked about Apollo. We were talking about anniversaries before
we started. This year will mark the thirtieth anniversary of Apollo
11. Can you share with us your memories of that event?
Vaughan:
Well, it was a great event. It's also the thirtieth anniversary of
all the things coming up to Apollo 11. Apollo 8, which is the anniversary
we just passed, was probably one of the most demanding and challenging
decisions that was made by NASA management to go do the Apollo 8 mission
at the time that we did that.
But the Apollo 11 was just tremendous, along with Apollo 10. See,
if you've been working on an objective for eight or ten years, and
a lot of us had been working on it since 1962 or so, it's really a
good feeling when you make it happen, see it happen, and then get
the crew back safely. So, a great feeling.
Bergen:
Wonderful. Did your group or any part of your group play a part in
the recovery of the Apollo 13 mission, with all the problems they
had?
Vaughan:
Well, we supported the mission, obviously, very much. The Propulsion
Power Division, which I was not heading at the time, I was still section
head in the reaction control area, but we had people who worked with
the failure investigation after the flight. We also had people who
helped understand and provide information about the various propulsion
systems during the mission. We had not used the lunar ascent engine
or the descent engine in the fashion that we used it, and I guess
it was a descent engine then, now that I think back on it, that was
used for the mid-course corrections and for bringing it back to doing
the trimming to come back to Earth, since the service module engine
was not available.
So when we had not tested for that directly, and, yes, we had people,
not me personally, but people within that division that were working
to be sure that we would get the expected performance and operation
of that hardware. And we worked with the power team as well. We provided
the fuel cells and electrical power, because the fuel cells were already
down after the service module went down, but we were using the batteries.
The Propulsion Power Division were responsible technically for the
batteries, and they knew we had an awful lot of insight into how they
would be used and how long they would last and so forth. Electrical
power, if you remember, was a key parameter—having enough.
Bergen:
Right. As you said, you worked on the Apollo Program for so many years.
How did you feel when it finally came to an end?
Vaughan:
Well, it didn't end just abruptly. After Apollo 11, we had Apollo
12 and 13 and all the way up to 17. So we tapered off on the program.
It wasn't as if we came up to a cliff. The coming up to the cliff
was basically getting the first objective done, of getting people
there and back. Generally, by the time we'd actually done that, it
was pretty well known or becoming to be known that the Russians were
not really as much in a race as we thought earlier. We didn't know
that for sure until after we'd done it, but it came out later, well,
they really weren't trying too hard, or what have you, you know.
So it's certainly challenging to meet your goals, and that is to get
them there and back within the decade. We just barely beat it. We'd
hoped to do it a year or so earlier, but we were pleased with the
overall objective. But the Apollo Program was continuing, and we were
adding experiments on board and trying to learn more about the lunar
surface. So it's not as if it was just coming up to a cliff and have
an abrupt end. We were able to taper off.
Bergen:
After Apollo, did you work any on Skylab?
Vaughan:
Well, really before Apollo. You know, most programs take a long time
for the development, and to be honest, even in 1966 or '67 time frame,
we worked on a space station and did some concept designs on a space
station and what it might look like. That work eventually evolved
in what was called a wet workshop, which was the S-IVB stage, if my
memory's right, of the Saturn launch vehicle. The plan for the wet
workshop was to launch it with propellant in it, and then to go up
and use it as an orbital workshop and put in your equipment and so
forth. Some of it would go in before launch, but most of it would
go in after launch. Obviously, as we studied that more and became
more realistic with the program, we eventually wound up launching
Skylab, already outfitted and ready for human occupancy at launch
time.
Yes, we worked on that, and even though it was primarily a Marshall
[Space Flight Center] undertaking for the Skylab itself, the command
service module, for instance, still had to have the capability to
dock with it, to provide some control, and to get the crew up and
back. The big new difference was on this on-orbit stay time, having
to be there with the command service module up to ninety days. If
you'll remember, all of the Apollo missions were only fourteen days.
So it was a pretty long extension of the capabilities of the command
service module. And from my division's standpoint, we had to work
those issues and be sure that the systems had that capability. Didn't
want to be there for thirty days or fifty days or sixty days or ninety
days and then find out you couldn't get home. So we needed to be sure
to get them home before we started.
Bergen:
That's right. As the Shuttle era approached, and as you said before,
all the programs seemed to overlap, but there was somewhat of a gap
between ASTP and the first Shuttle flight. What was the mood like
during that period of time?
Vaughan:
Well, there was a gap in the flights; there was not a gap in the work.
The development of the Shuttle started in, I believe, 1972. I believe
we had the first contract and it actually started internal studies
and so forth even earlier than that. We had the first contract, I
believe, with Rockwell [International] to do the orbiter and to start
on the overall integration for the Shuttle in either '73 or '74. My
memory's a little hazy on when that contract was written.
Of course, we were very, very busy in the engineering world, of going
through and scoping out what those systems—what the requirements
were for those systems and understanding from preliminary design standpoint
what kind of capability we required of those, and then what it would
take to go and develop them, and to bring that gap, most of that gap,
we were actually into what we called the design, development, and
test verification phase of the Shuttle Program. You'd like to not
have that much time between flights, but you do need a fair amount
of time for the DDT&E [design, development, test, and evaluation]
development, keeping in mind that the Shuttle, I mean, it was advancing
the state of technology in several areas, so it was a big development
activity.
Bergen:
And you were, in the early stages, still working in the RCS [Reaction
Control Systems] area?
Vaughan:
That is correct. Shortly after the Shuttle got going, I do remember
going out to Downey [Rockwell facility in California]. Well, first
of all, I worked with proposal evaluation on the Shuttle and worked
with the proposal—I guess it's called request for proposal,
getting the requirements squared away, and then worked on the Proposal
Evaluation Team as the proposals came in, and I also remember going
out to Downey and working with the fact-finding team, trying to understand
what their bids were and what the costs were, and the development
time and that sort of thing. So I spent a fair amount of time at Downey,
California, doing that. I think that was probably in 1974. My timing
may be a little bit off.
Bergen:
As you worked on the development of the Shuttle RCS, what kind of
advances or differences did you have from what you worked on in Gemini
and Apollo?
Vaughan:
Generally in the RCS systems, the big new requirement was for reusability.
With reusability, you have the issues associated with leaving the
propellant in the system when it comes back to Earth or taking it
out. And if you take it out, part of the issues with the hypergolic
propellant systems is that when they get moisture in those systems,
it creates some other bad chemicals and is very bad for us. We did
some special work early in the seventies, some test work, that helped
us decide that we could, in fact, reuse these propellants. A lot of
people had assumed that they would be unable to do that. In fact,
early on, there were oxygen-hydrogen systems baselined. Primarily
because of the reusability, they also have a little bit increased
performance from an engine standpoint. The overall system didn't have
any increased performance, but when you looked at it as a thruster,
I mean, it would have a higher ISP.
In fact, during the Phase B portion of the Shuttle Program, the baseline
was an oxygen-hydrogen system, but the type system we wound up developing
was a what we call [unclear] hypergolic system. Similar—same
propellants, basically, that we used for the Apollo RCS.
My group at that time, in addition to doing RCS, we had some new things
on Shuttle that we didn't have to have on Apollo. One of those was
the hydraulic system to provide controls, hydraulic power to control
the surfaces of the Shuttle wings and to provide the energy to gimbal
the main engines and that sort of thing. And we also had to have a
system to drive the hydraulic system. On airplanes you either have
the big jet engine that's going full time and it's easy to take a
little shaft power off of the big turbine and drive the hydraulic
pumps.
Of course, on Shuttle, while initially we had air-breathing engines,
but they didn't last very long because they were so heavy and they
were difficult to get to orbit and get back, but when we did away
with those, we did not have a power source, so we had to have what
we called an auxiliary power unit [APU] to drive the hydraulic system.
We still call it an APU, an auxiliary power unit. It's really not
auxiliary; it's a primary power unit for the hydraulics. My group
was given the responsibility for those two additional activities as
well as the RCS.
So we took on some new challenges, some things that had not been done
before. The APU, if my memory's right, the state of the art at that
time. We'd used them as energy power systems, generally having to
last ten, fifteen minutes to get an airplane down, some of these military
airplanes, from high altitude back to a landing, if they were to have
a main power system failure. In other words, if the main jet failed.
But we were looking at much longer operating times, plus reusability
on the auxiliary power system and hydraulic system as well. So it
was some new challenges involved.
Bergen:
Great. In 1975, you became deputy chief of the Thermochemical Test
Branch and then, three years later, chief of that branch. How did
your responsibilities change as you took on this new role?
Vaughan:
Rather dramatically. I was still dealing with components of the same
systems I had been dealing with before. There were some added systems.
That branch was responsible for providing test support or testing
of the kinds of components for the rest of the division. The rest
of the division was also involved with the fuel cells, the batteries,
the pyrotechnics, as well as the main propulsion system, although
we didn't really do very much work on the main propulsion system in
the thermochemical test area.
We used the thermochemical test area to understand how the hardware
would perform, what kind of issues we might have with it. We eventually
wound up doing the space qualification testing of the auxiliary power
unit in those facilities in the ‘77-‘78 kind of time frame,
but an awful lot of direct mission support.
Of course, when you're out testing, it's a little bit different from
a theory standpoint, from the overall systems that you're dealing
with in propulsion and power. The difference is that what you decide
that morning, you may go implement that afternoon. So, you know, the
timing of it was much, much different and we were dealing with high-energy
propellants, and you had to be very careful. High-energy propellants,
high-energy systems, pyrotechnic devices, of course, they do have
a lot of energy and they require a lot of energy, but you have to
be very careful with them and treat your procedures exactly right
and have a lot of discipline in the test program.
So that was a new environment for me, but it taught me a lot and I
learned a lot by doing that.
Bergen:
Do you have any particular instances, events that happened during
that time period, that stick in your mind?
Vaughan:
Well, yes, several. But one that probably would maybe be best to relate
is that we were doing development testing on an auxiliary power unit,
the APU that we talked about earlier. We ran an altitude simulation
in an altitude chamber, and we restarted the unit, left it at vacuum,
under vacuum conditions, so we'd run what we'd call an ascent profile;
in other words, during the ascent portion of the mission. And then
we shut it down and simulated an abort once-around [AOA] mission,
which means that you shut the unit down for a short period of time
while you're going around the Earth one time. During that time, the
heat soak-back [phonetic] on the turbine heats up the injector rather
high, and when we restarted the system about an hour, hour and a half
later, it blew up. You know, we had done similar tests at the APU
manufacturer.
The difference was that we had that test being performed at sea level,
we had the exhaust products being piped to altitude, but the overall
unit was under sea level atmosphere conditions, so the amount of heat
soak-back during the test at Sunstrand [Corporation] did not result
in getting the hardware quite as hot a temperature as it did in the
real space environment, because we didn't have conductive cooling.
What happened was that the hardware was just too hot. It created a
bubble or gas pocket in the feed lines for the APU, and when we started
the APU up and opened the values and that gas ran out and then was
recompressed very rapidly, it took us about a year, year and a half
or more to figure out exactly what happened. But it turns out that
we had generated a bubble, and when it got recompressed in starting
this system—it's called adiabatic compression, and adiabatic
compression heating, and it was enough to detonate the hydrazine and
cause the system to blow up.
Turns out, had we not run those tests in that facility, had we had
an abort once around, which we've not yet had in the program, but
we are certified to do that, we would have lost our units. We grow
bubbles in it, and it would have happened. It was just a difference
in the way we simulated the environment that the hardware would see.
As a result of that, we put in a little cooling system, pretty simple.
We didn't have much time to do it, but one of the ways to do it is
we had a thermocouple in areas where it would get hot, and we developed
a little water system, and actually just spray a little water on it
to cool it back down. So we were able to fly the basic hardware that
we had, but still be able to do the abort once-around mission if we
needed to do that. And that one stands out, still.
Bergen:
Makes you realize how important that testing phase is.
Vaughan:
No question. Of course, the first thing that happens is you have to
justify your test set-up, and to be sure that we didn't do something
different than what the manufacturer had done to cause the hardware
to blow up. That's a natural reaction. "You guys must have screwed
it up." And you're always concerned about that, because it's
difficult to get everything exactly right.
Turns out, that was a very, very good test. We wound up doing an awful
lot of work for Sunstrand after that, where they brought their engineers
down and we worked together, trying to be sure we had a good system,
and we worked all the way through the initial Shuttle missions.
I don't know if you remember, but we had a fair number of APU problems
early on in the early portion of the Shuttle Program. In more recent
flights—and I'm talking about since Challenger [STS-51-L]
and since fixing a lot of the problems we had on APU—we've not
had any flight aborts for APU in a long time, and we're glad. But
early on, we had several missions that were aborted because the APU
was not performing correctly.
Bergen:
During this time of the intermediate Shuttle development and later
in the eighties, you were on several Accident Investigation Boards
and special committees and things of that nature. I'd like to talk
about a couple of those. In 1980, there was an accident involving
the Shuttle extravehicular maneuvering unit, and you were on that
accident investigation. Can you tell us about that event and your
role in that?
Vaughan:
Well, yes, I could do that. And they were interesting. I was sitting
in my office one Friday afternoon, minding my own business, and things
going pretty well. I was out in the test area, you know, and as I
told you before, we have to watch our stuff pretty carefully or things
can go wrong. Anytime you saw or heard the fire engines, you always
went out back or went and looked to see which direction they were
going. They didn't come our way all the time, but they came our way
more than a few.
That particular afternoon, I had heard them, saw them come down, but
they were going in the other direction toward Building 7. Of course,
that was not my concern. About an hour, hour and a half later, I had
a call from my immediate supervisor, Mr. "Guy" [Joseph G.]
Thibodaux, and Guy says, "You're going to get a phone call from
the head of SR&QA [Safety, Reliability & Quality Assurance],
and he's going to ask you to take on a special job. You need to think
about what you're going to answer, how you're going to answer that."
A little bit later, I did get that phone call, within ten minutes
or so, and I was asked to head the Failure Investigation Board for
that. And I agreed to do that, because it's kind of hard to say no.
They had named the rest of the board members. We called an initial
meeting later that afternoon on Friday. That Friday, instead of leaving
early at two, three o'clock or so, I think we finally left the center
at maybe eleven o'clock or so.
But there had been a fire in Building 7. There was an EMU [Extravehicular
Mobility Unit]. The overall suit was laid out on the test bench. I
don't know if you've see pictures or remember any of the photos. No
one was inside the suit at the time, thank goodness; they would have
been killed had they been inside. This was the last test that they
were planning to run before someone would have been inside, so it
was close. But an individual that was operating the suit, he had to
reach over the suit and activate a mechanism on the EMU, and he got
burned pretty badly, so he was in the Galveston Burn Center that evening.
When you looked at the pictures or looked at the suit itself, you
see the helmet up there and the whole business laid out on the table,
and then this big burn hole right around the stomach area of the suit.
It looked very much like as if that was the person and someone burned
in there. We were debating as to whether we should even release the
pictures, because most people might believe that we had someone inside
the suit. Thank goodness we did not at that time.
The other issue that we had to deal with is that that system had some
high-pressure oxygen tanks, two of them. They're called a secondary
oxygen [propellent]—SOP. Second oxygen propellant, maybe, or
pressurant. We were not certain as to whether those high-pressure
tanks had vented or not, so here we were with a system that had been
involved in a fire, and we did not know the condition of the tanks.
We wound up not knowing that till the next afternoon. I took some
of my technicians from the thermochemical test area, in fact, and
put them behind some shields, and they went in and looked, again just
trying to be sure we didn't have someone hurt in a secondary event.
So it was an exciting six weeks, a long six weeks, but we finally
got to the bottom of that and had good support from all the team members,
and we were able to make improvements in the system that served us
well.
Bergen:
Great. You also participated on an Investigation Board that looked
at an incident in which a nitrogen tetroxide spill damaged Columbia's
tiles. Do you remember that incident?
Vaughan:
It's hard to not remember it, of that magnitude. That happened at
the Cape, on the pad. What happened was, we'd flown the first STS-1
mission, we'd gotten the vehicle back successfully, we were preparing
it for the second mission, and in loading the hypergolic propellants,
the nitrogen tetroxide, as the oxidizer, when the team was loading
the forward module—and that's up above the windshield and the
nose area of the Shuttle Orbiter—when they got ready to disconnect
the ground support equipment from the flight hardware, the quick disconnect
failed, and it failed in an intermediate position. It's supposed to
be either open or closed. When it's open, you can flow the propellant
into the vehicle. When it's closed, it's supposed to shut off the
flow path. It failed in an intermediate position, so the valve to
the system was closed, but the flow passage from the ground support
equipment, which also has propellant, was open, and so it continued
to flow propellant that had no place to go except to the outside and
get on the tiles.
They were able to detect that situation and correct it within a pretty
short period of time, a minute or two, but by then we had spilled
a fair amount of nitrogen tetroxide on the tiles. That overall event
would have been almost a non-event had it not been that the tiles
and the—I don't know if it's glue or exactly how—it's
not glue, I know it's not, but the tile attach materials were not
compatible. So in an hour or so, the tiles started sliding off the
vehicle. So we had to go through an awful lot of work to be sure that
we'd gotten all the tiles off that were affected and to replace those
to be sure that they would be okay for the next flight.
The other thing we had to do, obviously, as part of the review team
is to go in and understand exactly what had happened—it wasn't
obvious what had happened—and understand what corrective action
we needed to do on that. I was not the team lead for that activity,
but I did support it from JSC [Johnson Space Center], and I spent
probably a month or so at KSC [Kennedy Space Center] during that time.
Bergen:
In 1984, you became deputy chief of the Propulsion and Power Division,
and then two years later, chief of that division. Again, your responsibilities
probably changed dramatically.
Vaughan:
They did. And what I said earlier was that my work at the Thermochemical
Test Branch was very important in terms of teaching me not only the
test disciplines, but we were also testing hardware that were the
engineering responsibilities of the other branches within the division.
So by the time I came up to deputy division chief and, later, division
chief, I already had a lot insight into the other systems that the
division was responsible for. So that was very helpful in getting
me ready for those jobs.
Of course, the Propulsion and Power Division is responsible and still—well,
was until we turned over an awful lot of it to the USA [United Space
Alliance] contractors that we had, the subsystem managers for all
of the propulsion systems, the power systems, the pyrotechnics, the
hydraulics, APU, and those things, most of them dealing with high-energy
propellants and high-energy materials so that you had to be very,
very careful. They enable you to do space flight, but they can also
get you in real serious trouble in a hurry.
Bergen:
In 1991, you had a pretty significant change in jobs. You became chief
engineer in the Office of Space Flight at NASA Headquarters, and you
were the first person to ever have that position. So you had to basically
develop what roles that person, that job was going to have, right?
Vaughan:
That is partially correct. Turns out that the job I went to was given
a new title as chief engineer for the Office of Space Flight. Dr.
Bill Lenewell [phonetic] was head of the Code M [Office of Space Flight]
at that time, and he had had Hank [Henry W.] Hartzfield up earlier
doing a similar job, although Hank did not have that title.
You know, the chief engineer for Code M is a pretty big title. I wondered
exactly what you're supposed to be, because you can't be the smartest
guy on everything. In fact, you know you're not. What you're trying
to do is coordinate the activities and be sure that things are done
correctly and to try to give the Washington program managers, like
Dr. [William E.] Lenoir and others, the right perspective on engineering
kinds of things as they come up.
So, yes, I enjoyed that year here. Bill Lenoir would have liked to
have made that a more permanent job. I didn't want to stay that far
from Houston that long, and he agreed that we would make it one year.
We did that, and that was a big learning experience as well.
Bergen:
So you decided to come back to JSC after that?
Vaughan:
Yes. Aaron Cohen was our center director at the time, and Aaron and
Henry [O.] Pohl were gracious enough to leave my job as Propulsion
and Power Division chief, and Ralph Taeuber ran the division as the
deputy while I was gone, so I was able to also come back to the job
I had prior to that. So they were both very, very good to me.
Bergen:
Great. Shortly after your return, you were promoted again to deputy
director of the Engineering Directorate.
Vaughan:
That is correct. You know, I hadn't necessarily expected that. The
things that were happening in the interim was the Space Station redesign
and the Crystal City activity, so that there were a lot of things
going on both at the center and at headquarters with respect to organization
and that sort of thing.
Henry Pohl wound up, he had been director of engineering for the Johnson
Space Center earlier than that. Henry was the design lead—well,
was the lead for the Johnson Space Center, who had the lead on Option
C for the Space Station redesign. If you'll remember, we had three
different options that we were chartered to look at, and Henry basically
took himself out of Engineering Directorate role and moved over to
head up the redesign activities associated with Space Station for
Option C. Henry elected to retire after that point in time, and it
turns out that the deputy director had retired—Max Engert—and
so Leonard Nicholson was appointed as engineering director, and shortly
thereafter he asked me to come up and I served as his deputy for several
years.
Bergen:
You mentioned the Space Station redesign. Can you talk a little bit
about that and why it came about and what your role was in it?
Vaughan:
Well, it's hard to know all of why it came about. Obviously we changed
administration with the [President Bill] Clinton administration coming
on board in 1992. And that was coupled with the fact that we were
having some fairly major technical and management difficulties in
the Freedom Program. My understanding, although I'm not sure if it's
true, but my understanding is that President Clinton, as he came on
board in his new team, basically had the Space Station on the chopping
block; in other words, planned just to cut it out of the program and
not have a Space Station.
As you know, Mr. [Daniel S.] Goldin was already NASA administrator,
and as I understand it, Mr. Goldin pleaded with them and got them
to agree to allow him to redesign the station as opposed to totally
canceling it, try to get it under better control and to reduce the
overall projected cost of the program.
As a result of that, there were a group of us that were called to
NASA Headquarters back in probably February '93, and at that time
we were going to do the work at Headquarters, or at least in this
task force at Headquarters, and we were challenged to come up with
three different options that would be available for the administration
to select from. And we spent time on that from about February of '93
until around June '93. The Best Committee was set up, a blue-ribbon
team, headed by Dr. Best from MIT [Massachusetts Institute of Technology],
and he had an overall team, and we reported up through that team,
and they reported through the administration and to the White House.
Big-time activities during that time.
Bergen:
Did you work on several of the options or just on Option C?
Vaughan:
Well, I was there at Headquarters during the total time. At Crystal
City, not at Headquarters, but near Headquarters. Obviously I was
exposed to all of the options, and there were certain parts of the
program that would be constant, independent of which option was selected.
But I was the lead for Option C, so I spent most of my time on Option
C and dealing with Henry Pohl, who was making real work happen, he
and John Aaron down at the Johnson Space Center. So we did an awful
lot of design work very rapidly, trying to get that option defined
and have it ready to present.
I did have the opportunity to present. I think we presented either
two or three times to the blue-ribbon committee, in public. They were
public hearings. So we went down to the big conference room and provided
status for a couple of times, and then kind of a final briefing to
them, end of May, early June '93.
Bergen:
So what was your opinion on the configuration of the station that
was finally chosen?
Vaughan:
Well, one problem with the station is that there's so many different
configurations that are okay. I mean, you know, in fact, I've frequently
told people that one of the difficulties we've had with the Space
Station is there's so many options, we've not stuck with one long
enough to get it going. So I believed, and still believe, that Option
C would have been a better option. I'm sure I was biased on that subject.
I can tell you that our projected cost for it was less, and our projected
flying time, getting it on orbit, was quicker. In fact, we went to
the congressional hearings on the day that the selection was announced,
and we got there before it was announced. In fact, the hearings were
about an hour late starting, and there was an announcement sheet put
out before the hearing started, and it indicated that they had selected
Option A.
I can remember Congressman Hall asking Mr. Goldin, "Mr. Goldin,
I understand Option C was cheapest, had more capability, and could
fly faster. Why did you select Option A?"
And Mr. Goldin's response was that he would let Dr. Gibbons answer
that. And Dr. Gibbons, of course, was the White House scientific advisor,
I believe was the right title at that time, and Dr. Gibbons' comment
was that it just wasn't the right time for Option C. Some of the internationals
were very much opposed to it. They felt like it diminished their contribution
toward the program, and there were some other difficulties with it
that they were concerned about as well.
So, you know, again, we had three options on the table from our standpoint,
and, in fact, we were encouraged to—not encouraged, but—I
don't want to say "lectured to" either, but basically told,
"Hey, let's just lay it on the table, what this is, and not try
to do any selling of the various options." This was for the last
presentation we did to the blue-ribbon team.
And I think each of the three leads, in fact, laid the best facts
on the table that we could. From a NASA standpoint, we were chartered
with being sure that either of the three options were okay. And I'm
okay with the option that was selected. You know it was modified rather
dramatically. It started being a U.S. option—not a U.S., but
it did not include the Russians. And later, the Russians, later in
'93, in fact, the Russians were brought into the program, and it changed
the program some, but not dramatically, the most dramatic part being
the use of the Russian hardware, including propulsion, in the way
we build the station. We would have assembled it in a little different
configuration, had we not had the Russians involved.
Bergen:
Did you play some role in bringing the Russians into the Space Station?
Vaughan:
Not directly in terms of deciding to bring them in. Once that decision
was made, in fact, during the redesign, each of the three leads did
brief the Russians on what we were doing several times.
Turns out, even though the Russians were in the Washington, D.C.,
area during the redesign activity and we had some discussions with
them during that time, either the Congress or some part of the government
had not cleared us to involve the Russians in the program at that
time, and it was after the decision was made on Option A in the August
or so time frame, maybe September, that the Russians—we were
looking at bringing the Russians into the program much more heavily.
I did go back to Crystal City after coming back to Houston in June.
I went back to Crystal City in the August-September time frame, helping
to find what roles the Russians might play and how the hardware configurations
might go together, and I did go to Russia in early—not early,
but in about September-October '93, again exploring ways that we might
be able to use the Russian hardware.
Bergen:
Your last position that I'm aware of at NASA was as chief engineer
of the Space Station. Was that your last position?
Vaughan:
That was my last position. I had the opportunity to do one another
job in the meantime, and that was in about the '94 time frame. The
center director at the Marshall Space Flight Center, [G.] Porter Bridwell,
had decided that he wanted a rotating acting deputy center director,
and he'd had a guy from Langley come down and do that job with him
first, and after the Langley guy's six months was up, I was asked
if I'd go do that, and I did that for four months. It turns out that
there was some other changes at Marshall and my tour was cut short,
but I did spend four months at Marshall as the acting deputy center
director working with Porter and with the Marshall people, and I thoroughly
enjoyed that. I knew a lot of the people already, but, you know, we
formed some bonds that still exist today.
So when I came back from that one, Dr. [J.] Wayne Littles, who had
been announced as Code M chief, asked me if I would come and be chief
engineer for the Space Station. If you'll remember, at that point
in time, that would have been late '94, maybe early '95, I think it
was actually early '95, the centers had not been very involved in
the station. In other words, the blue ribbon Best Committee had said,
"Hey, you centers get too involved in these programs, you inhibit
them too much. We want a very small program office and not bring the
centers into it very much."
Well, the chief engineer's job in trying to bring the strength of
the organization, technical strength of the organization, back to
the program, I think was started with the set-up of the chief engineer's
job. I was still assigned to the Engineering Directorate, but I was
working very, very closely with Mr. [Randy H.] Brinkley and his team.
There were a lot of people who were skeptical about that, because
they weren't quite sure what responsibilities I would be resuming
that they had had all on their own previously. It turns out that what
we were really trying to do is bring some of the technical strength
of the centers to bear on the program to make it a better program,
and I believe Mr. Brinkley and others would believe that we were successful
doing that.
So, I enjoyed it, and that was my last position working with NASA.
It was very enjoyable. Mr. Brinkley is a tremendous individual and
a great program manager, and I enjoyed working with him.
Bergen:
So, when exactly did you leave NASA?
Vaughan:
I left NASA in—let me get the year right here. Must have been
February '97. So, from about early '95 until a little over a year.
I may be off a year. Sounds like I'm off a year. I spent a little
over a year as Space Station chief engineer. And I've been with Boeing
[Company] for, what, a little over two years, two and half years now.
So we're '99, three years from that would have been '96. Maybe I left
NASA in February '96.
Bergen:
And what do you currently do at Boeing?
Vaughan:
Well, it's a lot of the same things I did as chief engineer for NASA.
I'm not the chief engineer by title for Boeing, but I do an awful
lot of troubleshooting. My job title says "independent assessment,"
and I report directly to the vice president and program manager for
the Space Station on the Boeing side. Doug Stone says, "Well,
you know what it is you need to do. Go figure out what it is and do
it." So he gives me an awful lot of flexibility, and I try to
work with, from an engineering standpoint, what trouble spots that
we have.
What I do more than anything else is try to help with the communication
and getting the right people together, getting the right dialogue
going so we can solve the problem at hand. And there's always a problem
at hand, so no lack of work.
Bergen:
So, looking back at the achievements that have been made in the Space
Station in the last few months, even, can you give us an overview
of the positive and maybe some negative of what you see in the Space
Station Program and its future?
Vaughan:
The negatives—and I'll cover those first just to get them out
of the way—the negatives are, we should have been flying a long
time ago with Space Station. Most people think of the Space Station
as our first Space Station. Obviously, if you think back, Skylab was
really our first one. We should have figured out a way to keep it
up and to use it, and we did not do that. It's taken us much too long
to get the station flying, for some of the reasons we've talked about.
The good-news part is that we've already got it started. We have a
long way to go. And some of the good-news parts of it are that we
took the hardware that was designed and developed in Russia, other
hardware that was designed and developed all over the U.S., and we're
putting that hardware together and it's working. We have a long way
to go, because we've only got two elements up in that mode at the
moment, but we've got many other elements that are already at the
Cape and being prepared for flight.
We've got the service module, which will be shipped to their launch
facility, I think it's in mid-February or so this year. In fact, I'm
going over to Russia later this week, and we'll work with the acoustics
team, trying to be sure that we're running the right tests and understand
what the acoustic noises are inside the vehicle, because if they're
too high, we have to take some measures to quiet it down some.
But that hardware is also getting ready to fly. Once we get the service
module up and operating, we'll have the course systems that we need
to really support station, not independent of the Russians, but if
they didn't bring any other hardware except for the resupply vehicle,
the Progress vehicle, it would not inhibit us from finishing
out the build on the U.S. side and providing the capability on the
U.S. side. Now, obviously we hope that they bring their research modules
and power tower and those things to the program, but we will not be
dependent on those as we are with the service module.
So we've got a big milestone coming up, hopefully in July, that that
vehicle will be launched, the service module will be launched, and
once we have it on and operating, we'll have made a big, big step.
I think if you take a look a year, year and a half from now, we'll
have us an operating station that has a tremendous amount of research
ability. And as we complete the build, it'll have capability that
will not even have been close to anywhere in the world in the past.
So it's still exciting, and it's good to be a part of that.
Bergen:
Great. You've been in the space program for many years and seen many
programs go by. Looking back at the past few Presidents, [Ronald]
Reagan made a pledge of a space station within a decade in 1984, and
then, next, [President George] Bush came along and announced initiatives
to finish Freedom and establish a permanent base on the moon and then
later go to Mars in thirty years. They didn't seem to get the public
backing that [John F.] Kennedy got in the sixties. What kind of change
have you seen in the American public with regard to the space program?
Vaughan:
I think the American public still supports the space program, very
much so. A primary difference is that we didn't have the Cold War
emphasis associated with the country, you know, the Soviet Union at
that time, who had supposedly declared that they would take over the
world. I mean, and that was not a secret. They announced that as often
as they could. I think when the Soviet Union put the first unmanned
spacecraft into orbit first and then the first human in orbit, it
showed that the U.S. could potentially, at least, be far behind them,
and they were making an awful lot of, if I can say hay, or at least
positive propaganda on those events toward world opinion and toward
their objectives for being able to control the world, it woke a lot
of people up in the United States.
When President Kennedy realized what we needed to do to get our energies
focused and to be sure that we were, in fact, foremost in the space
technology, most people believed that whoever ruled space would also
rule the world to a very large extent, particularly if they were going
at it trying to rule the world from a military standpoint.
The Space Act of 1958 did put the space and with some worldwide agreements
that we would not use space for military operations, we all know that
even though we've not attacked from space, it has been used for espionage
and for understanding what's going on around the world, and the U.S.
has done an awful lot of that, too. I think it's that atmosphere and
the fear of the American people, and the challenge, of beating the
Russians to the moon and being foremost in the technology is what
gave us the kind of support that we had from a Congress and from the
American people standpoint.
I think the American people still support it. It's just that it costs
a lot and there are other priorities. I don't think there was any
lack of belief from President Reagan's standpoint that he could have
the Freedom Program flying in the decade.
Vaughan:
It's just because of all the difficulties that we ran into, both management
and technical, along the way, and funding, we were not able to do
that, but I believe those guys thought we could. I think the same
is true with President Bush. And who knows what we'll have in the
next thirty years? They're not up yet.
I will say that an awful lot of people, including the general public
and a lot of people who are in the space business, don't totally appreciate
what it takes to get beyond Earth orbit. I mean, it takes a lot to
get to Earth orbit, as you know, but it takes a lot more to get beyond
that. I can remember Dr. [Robert R.] Gilruth saying more than once
after the Apollo Program, is that people will understand how hard
it was to get to the moon the first time when they try to go back.
They'll find out how difficult it really was. Of course, we've not
been back in a different program yet, so that's still in front of
us.
Bergen:
We have a few minutes left, so I wanted to see if Kevin has some questions
for you.
Rusnak:
While you're reflecting back, you've commented on changes in the American
public's perception. How would you say NASA has changed from the inside
in the past forty years? We're celebrating the fortieth anniversary
[of NASA], or it just ended.
Vaughan:
Well, it's hard to know. I mean, organizationally, the organization
grows up and becomes a bureaucracy, and then it reinvigorates itself.
Most organizations go in cycles like that. We wind up with a lot of
people thinking back and looking at a new program and deciding what
we need to do is put things in place to keep us from making the mistakes
we made in the last program, and you do enough of that and it puts
a lot of bureaucracy in place.
But for the most part, it hasn't changed all that much. We've had
a lot of new people coming into the program. I think most of them—I
know most of them are much more capable and have better tools that
we had in the sixties, from the computers and the analytical capabilities
and so forth, and an awful lot of enthusiasm throughout the program.
The challenge is not quite as great as it was because of the national
defense and the national survival that we had when we were in a mode
of survival and competing with the Soviet Union, but I think that
the scientific exploration and the engineering achievements are still
something that a lot of people get excited about. I know a lot of
people still work just as long hours or are just as excited about
the jobs now as they were during the sixties.
So, changes, yes. Some better, some not so good, but overall the program's
still strong and doing well, I think.
Rusnak:
A lot of the people who worked on Apollo, for instance, such as yourself,
have left NASA. What impact do you think that will have on efforts
to essentially repeat going to the moon or more advanced projects?
Vaughan:
It's hard to say. Again, the two sides. One is that when you go back,
when we get ready to go back, the technology will have changed so
dramatically that we wouldn't want to use the same systems that we
had last time, so it's not a matter of coming back and reengineering
those systems. So you want to take advantage of the new technology,
you don't want to be hampered by the things that bit us during the
Apollo Program, and you wind up with a little bit of both of that.
The main difference that I see is that the country does not have as
much work going on as I'd like to see in the propulsion area, with
the big propulsion systems, the high-energy systems, and what we need
to do is to be sure that we don't let that technology and that capability
die on us. There is some very special analyses and development things
that you need to do to make the big engines, like the Space Shuttle
main engine that's a real model in the world, still today. An awful
lot of people that worked on the development of that engine and understand
why it happened and how it happened, and what to watch out for, certainly
won't be with the program. What we need to do—and I think what
we are doing, to a large extent—is keeping enough activity going
so that we do have a core of people who understand and can do that
type of work for us.
In terms of avionics and structures and so forth, the big airplanes
that we've got going now and the other things that are happening in
the computer and the overall avionics world, I mean, including GPS's
[Global Positioning System] and all that good stuff, you know, that
ought to just make things easier for us. So I'm more concerned in
those areas that don't have other commercial application.
We do have an awful lot of commercialism going on, as you know, in
the unmanned space business right now, particularly with communication
satellites and those kinds of things. Boeing has the Sea Launch Program
going. Boeing also has the Delta IV Program going. And I know that
there are several private initiatives looking at two-stage fully reusable
systems. So hopefully there will be enough overall activity to keep
both the spacecraft and the propulsion systems technology in hand
and enough capability to really implement that when it's ready to
go.
Rusnak:
Also, last time we talked, you mentioned some people who had been
important to you as a co-op at Langley. In the years since then, who
would you say some of the key people had been, from your perspective,
who have influenced you or who you regarded as role models or like
that?
Vaughan:
You mean in my career?
Rusnak:
In your career, yes.
Vaughan:
Henry Pohl would be one of the first ones I'd say, Guy Thibodaux,
a second. I think I mentioned both of those quite a little bit. Our
organization in the division was stable for an awful long time. Henry
and I started working together as co-engineers back in about '62,
and we still get together and talk. Of course, I worked for Henry
throughout that career. We both moved up together. Guy Thibodaux,
another one. Max [Maxime A.] Faget certainly had a big, big influence
on what we were doing throughout. And, of course, Dr. Gilruth, as
a center director and remaining center director, I believe, what,
until about 1970? I can't remember the timing exactly. But had a big
influence. Dr. [Christopher C.] Kraft [Jr.], obviously. Aaron Cohen.
So, different people we worked with.
One of the nice things that I found in my career is that all of my
supervisors and management teams, and I'm including up to the Washington
area, we would also deal frequently with Washington in our areas,
would generally provide us with enough flexibility to go do what it
is we needed to go do. And yet they provided us some very good direction
in terms of limits on occasion, too.
One of the things that probably didn't show up in my resume, but I
had the opportunity to work on, was the hydrogen leaks of 1990. You
know, the Shuttle Program was down almost the year. It was like eight
or nine months without any flights in the 1990 time frame, because
we had hydrogen leaks on the pad. We couldn't get it to leak during
checkout, but when we'd load the tanks and load the systems for flight,
we'd find excessive leakage. I was on the team that finally went to
Florida and tried to—in fact, we found the leaks finally and
got them corrected.
But part of what was happening in the meantime is that we were taking
various components off and taking them to various test facilities
around the country, and Aaron Cohen, who was center director at Johnson
at the time, finally said, "You know, guys, this leak happened
in Florida. Let's find it in Florida." And what he was meaning
by that is, "Hey, let's quit tearing the vehicle apart and go
find the leak." I mean, that was pretty specific direction, and
we took it, and we found it. Because that was the kind of guidance
that we frequently got from my management teams, at least in my view.
Rusnak:
Did you still have time?
Vaughan:
I'm not hurting real bad. I need to be back by 10:30.
Rusnak:
I just had a few specific questions, if you did have the time.
Vaughan:
All right.
Rusnak:
Going back to the station redesign, the station Option C bore similarity
to the Shuttle C concept. Did you draw any on that design heritage?
Vaughan:
Some, obviously. I can't remember. Shuttle C, if I remember right,
also brought the engine pods back.
Rusnak:
Right.
Vaughan:
Yes. So it was a big payload, delivering big payloads, but bringing
key elements of it back to the Earth for reuse. The space flight—I
mean, reusable vehicles bring a down side with them as well, you know.
I mean, the down side is, you don't have the production capability
or the production line running that provides you the capability to
build new items. The up side is that because you're able to reuse
them, you don't need that production. But it does take away from your
overall ability. Of course, when we don't have the Saturn V anymore
and we've not had it for a long time, and if you're putting things
in orbit 40,000 pounds each, and if you're wanting to go to Mars with
a human exploration, it takes an awful lot of Shuttle launches to
do that. So we know we need some heavy launch capability, and that's
what we're trying to get with the Shuttle C, hoping to be able to
reuse the engines and the more expensive avionics portions of the
system.
In Option C, we were doing a similar thing, except we were going to
take the oldest vehicle and just use the propulsion modules and the
avionics associated with that, and not try to bring them back, but
to put this large payload, the overall station into orbit with one
single launch. So there were a lot of similarities, but an awful lot
of differences.
We spent most of our time trying to describe the structure and the
internal portions of Option C to make it into a good Space Station.
It would appear a lot like Skylab, but be updated with the system
racks and payload racks and have the flexibility that we're currently
looking at, and updated with the current state-of-the-art other equipment
and materials. So it was a much different approach to it, even though
each of them we used the components from Shuttle and trying to get
a heavy payload into orbit and recover. Shuttle C, the emphasis was
not on the payload itself, but on what you had to do to get the recovery
of the hardware that you'd want to reuse. And I'm talking about the
main engines and the pods and the avionics. In Option C, we decided
that would be too big of a hit. We would just not try to recover that,
but get the overall vehicle launched in one launch.
Rusnak:
Earlier I think you mentioned that you had some exposure to the early
Shuttle proposals and evaluating some of that. Do you remember any
of the other proposals that weren't selected for the Shuttle, and
would you have any comments on those?
Vaughan:
Well, I remember the Lockheed [Corporation] proposal. I can't remember
who we—we had, I think, three bids. I know Rockwell had a bid,
Lockheed had a bid, and I can't remember for sure. There were a lot
of things on the Lockheed proposal that we wound up implementing in
the Rockwell plan, to be honest. I mean, we didn't copy them from
there, but as they evolved, they looked a lot like it. But, you know,
either one of those systems could have been made to work, and it was
a combination of factors. I'm not sure what the overriding factors
were and the overall evaluation. I was looking at it primarily from
a propulsion and fluid systems standpoint. Either one of those companies
could have done that job at that point in time, from that standpoint.
Not but so many ways you can do that job.
One of the big discussion items is whether you have a straight-wing
vehicle or the Delta-wing vehicle. Of course, Dr. Faget was always
in favor of the straight-wing vehicle, you know, and I think either
one of those could have worked. It's a matter of choices, again, and
by the time you get around to implementing it, you've got to decide
which one you want to implement and then go do it.
As I said earlier, with the Space Station there were so many options,
and when you're putting things together in Tinker Toys—"Tinker
Toys" is the wrong way to say that—but in a modular fashion,
launching 20, 30, 40,000 pounds at a time, then that gives you a lot
of flexibility. That flexibility also creates an opportunity for a
lot of people to change things around, and when you change them around,
it sets you back and keeps you from getting up and getting it flying
as quickly as you would if you didn't do that.
Rusnak:
Going back to Apollo, at the beginning of the interview and beforehand
you've discussed the anniversaries, the thirtieth anniversary of Apollo
8 and Apollo 11. Which of those do you think was more significant,
at least personally at the time?
Vaughan:
Oh, they both were, particularly with 8 and 11. Apollo 8, you know,
was the first time we had taken humans beyond the pull of the Earth's
gravity. So that was the significance of that mission. Watching the
vehicle as it slowed down velocity-wise, moving from the Earth toward
the moon, and it continued to slow down, slow down, and slow down
velocity-wise until it got to the neutral point. I don't know exactly
how the—I mean, there's a special word for that. And then when
the moon's gravity starts taking over and starts speeding up again.
But that's the first time we'd seen that type activity with a human
space flight.
The other thing that happened is that we wound up getting continuous
data, essentially continuous data, once we started going to the moon
and not in Earth orbit, simply because you had a line of sight to
three big antennas that we had looking toward the moon. In all of
the flights, including the Apollo flights that were Earth-orbital
flights, we didn't have the teachers that we have today for the Shuttle,
so we wound up with short periods of coverage and short or long periods
of no coverage. So, you know, the amount of data that we were starting
to look at was significantly different on the Apollo lunar programs
than they had been on the Mercury and Gemini Programs and the early
Apollo Programs.
So, seeing the people escape the Earth's gravity certainly was big,
not as big as landing on the moon, which is what our real objective
was, and you've got to say that that had to be the biggest one, but
they were all big. Each one of them, each of those flights, dramatically
stretched what we had done the previous flight.
Even the Apollo 10 was a full dress rehearsal for Apollo 11. We did
virtually everything except actually land on the moon. We did separate
the lunar module, we fired the descent stage, we got within pretty
close range of being landed. We didn't actually do that. We fired
the ascent engine, went back and rendezvoused. Almost everything except
the actual landing itself. And we would run into difficulties on each
of those missions, and you had to deal with those before the next
mission.
If my memory's right, I believe Apollo 10, we had some oscillations,
pressure oscillations in the fuel cell system that we had to deal
with before we could fly Apollo 11. So, always some challenges between
missions, being sure that we understood what was going on and what
the effect was or to find a modification for it if need be. And, you
know, two months—we were flying every two months. Pretty rapid.
Rusnak:
Do you remember what you were doing during key points, referring to
those missions such as the Genesis reading on Apollo 8 on Christmas
Eve or during the landing and such?
Vaughan:
Yes. During the Apollo 8, with the Genesis reading, I was in Building
45, in what we call the mission evaluation room. That was where engineering
groups were sitting, monitoring the flights, supporting the flight
controllers. There was a little bit more of a barrier between that
group and the flight controllers, the fear always being that the flight
controllers would get interfered with by the engineers if the barriers
were too low. And we still have to watch that. But that's where I
was during that one, and I was also there during the ascent phase
of the liftoff from the moon.
The landing, I was home with my wife and two kids, and we watched
it on TV. So I was not in the center at that time, but I was watching
it quite carefully. And what it amounted to was we had different people
and even the mission evaluation room filled up very rapidly if you
allowed everybody to be in there. Even management might like to be.
But I was there pretty often.
Rusnak:
That's all the questions I had. Thank you.
Bergen:
I just have one final question. Your career spanned basically the
whole manned space program. As you look back, what of your accomplishments
are you most proud of during your career?
Vaughan:
Being a team member, I think, and being a part of NASA, and not just
NASA, but the overall aerospace, now that I'm not NASA. I mean, the
aerospace. And I knew long before I was not NASA that it's the total
team that counts and being able to work in a team environment and
make things happen. And we've been on the cutting edge most of that
time.
Bergen:
It's been very exciting.
Vaughan:
Yes, and still is. It still is.
Bergen:
We thank you so much for coming and sharing with us.
Vaughan:
You're welcome.
Bergen:
It's been very enjoyable.
Vaughan:
Thank you. I appreciate the opportunity.
[End
of interview]